Perbandingan Metode Pert Dan Fuzzy Logic Application For Schedulling (Flash) Pada Penjadwalan Proses Fabrikasi Boiler (Studi Kasus: PT Indonesian Marine Corp. Ltd.)
Main Author: | Vizkia, Naura |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://repository.ub.ac.id/142716/7/SKRIPSI_FULL.pdf http://repository.ub.ac.id/142716/ |