Perencanaan Penjadwalan Operasi Proses Permesinan pada CV. Pabrik Mesin Guntur Dengan Metode Flexible Job Shop Scheduling (FJSS)

Main Author: NugrohoSetioAji
Format: Thesis NonPeerReviewed
Terbitan: , 2008
Subjects:
Online Access: http://repository.ub.ac.id/138968/
Description not available.