Determination of production schedule can be done by constructing a network. One of the methods used to determine schedule and arrange network is CPM (Critical Path Method). CPM is diagramming techniqu
Main Author: | Astuti, IndrianaDwi |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2015
|
Subjects: | |
Online Access: |
http://repository.ub.ac.id/130117/1/Skripsi_%28Indriana_Dwi_Astuti_-_115040101111050%29.pdf http://repository.ub.ac.id/130117/ |