EVALUASI PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEKS AND SMITH (CDS) UNTUK MEMINIMALKAN MAKESPAN TIME (Studi Kasus pada PT. IGA ABADI Pasuruan)

Main Author: M, Oktarika
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2007
Subjects:
Online Access: http://eprints.umm.ac.id/8740/1/EVALUASI_PENJADWALAN_PRODUKSI_DENGAN_MENGGUNAKANMETODE_CAMPBELL_DUDEKS_AND_SMITH.pdf
http://eprints.umm.ac.id/8740/
ctrlnum 8740
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/8740/</relation><title>EVALUASI PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEKS AND SMITH (CDS) UNTUK MEMINIMALKAN MAKESPAN TIME (Studi Kasus pada PT. IGA ABADI Pasuruan)</title><creator>M, Oktarika</creator><subject>T Technology (General)</subject><description>PT. IGA ABADI Pasuruan represent peripatetic manufacturing business in area of furniture. In this time PT. IGA ABADI Pasuruan produce various is acid furniture type like : Bed Side Chest, Single Dresser, Blanked Chest, Chest Night Stand, and Drawer Chest.&#xD; Scheduling of production is Resource allocation from time to time to execute a group of work. Intention of scheduling is to facility allocation produce in this case machine to work by determining production process sequence a correct product to be time minimization workmanship of expense and product can which released by company.&#xD; Intention of this research to give proposal consideration of production schedule sequence for the minimization of time makespan.&#xD; With method of Campbell Dudeks And Smith obtained by sequence of job ( Sequencing) in January that is Blanked Chest - Chest Night Stand - Drawer Chest - Bed Side Chest - Single Dresser with makespan 299.95 jam, in Februari that is Blanked Chest - Chest Night Stand - Single Dresser - Drawer Chest - Bed Side Chest with makespan 270.64 jam, in March that is Chest Night Stand - Drawer Chest - Blanked Chest - Bed Side Chest - Single Dresser with makespan 343.31 jam and an April that is Drawer Chest - Chest Night Stand - Single Dresser - Blanked Chest - Bed Side Chest with makespan 324.72 jam.</description><date>2007</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/8740/1/EVALUASI_PENJADWALAN_PRODUKSI_DENGAN_MENGGUNAKANMETODE_CAMPBELL_DUDEKS_AND_SMITH.pdf</identifier><identifier> M, Oktarika (2007) EVALUASI PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEKS AND SMITH (CDS) UNTUK MEMINIMALKAN MAKESPAN TIME (Studi Kasus pada PT. IGA ABADI Pasuruan). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>8740</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author M, Oktarika
title EVALUASI PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEKS AND SMITH (CDS) UNTUK MEMINIMALKAN MAKESPAN TIME (Studi Kasus pada PT. IGA ABADI Pasuruan)
publishDate 2007
topic T Technology (General)
url http://eprints.umm.ac.id/8740/1/EVALUASI_PENJADWALAN_PRODUKSI_DENGAN_MENGGUNAKANMETODE_CAMPBELL_DUDEKS_AND_SMITH.pdf
http://eprints.umm.ac.id/8740/
contents PT. IGA ABADI Pasuruan represent peripatetic manufacturing business in area of furniture. In this time PT. IGA ABADI Pasuruan produce various is acid furniture type like : Bed Side Chest, Single Dresser, Blanked Chest, Chest Night Stand, and Drawer Chest. Scheduling of production is Resource allocation from time to time to execute a group of work. Intention of scheduling is to facility allocation produce in this case machine to work by determining production process sequence a correct product to be time minimization workmanship of expense and product can which released by company. Intention of this research to give proposal consideration of production schedule sequence for the minimization of time makespan. With method of Campbell Dudeks And Smith obtained by sequence of job ( Sequencing) in January that is Blanked Chest - Chest Night Stand - Drawer Chest - Bed Side Chest - Single Dresser with makespan 299.95 jam, in Februari that is Blanked Chest - Chest Night Stand - Single Dresser - Drawer Chest - Bed Side Chest with makespan 270.64 jam, in March that is Chest Night Stand - Drawer Chest - Blanked Chest - Bed Side Chest - Single Dresser with makespan 343.31 jam and an April that is Drawer Chest - Chest Night Stand - Single Dresser - Blanked Chest - Bed Side Chest with makespan 324.72 jam.
id IOS4109.8740
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:41:13Z
last_indexed 2017-03-21T02:41:13Z
recordtype dc
_version_ 1675924139874975744
score 17.538404