ANALISIS RE - LAYOUT PABRIK UNTUK MENINGKATKAN EFEKTIVITAS PROSES PRODUKSI Studi Kasus Section Production Bucket PC 300 Tiger Tooth PT. Katsuhiro Indonesia

Main Author: ARDIANSYAH, RUDY
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2009
Subjects:
Online Access: http://eprints.umm.ac.id/862/1/ANALISIS_RE.pdf
http://eprints.umm.ac.id/862/
Daftar Isi:
  • Planning and arrangement arrange factory situation very is having an in with of process evacuation of materials, so that activity formation device and determination of materials stream trajectory can co-ordinate better. With determination of good materials stream trajectory will obtain;get evacuation of efficient and good materials, efficiency goodness to distance, time, and also efficiency to place or room. Target of analysis of Re-Layout this is to design to repeat to arrange facility situation [in] Section Welding Bucket PC. 300 Tiger Tooth PT. Katsushiro Indonesia, method the used [is] Method of Activity Relationship Chart ( ARC). Analyse research focused [by] [at] frequency, distance, and material momen of handling. With this method [of] distance transfer of lessened success materials till 30.6%, and production time can lessen equal to 9.66 %