EVALUASI BIAYA DAN WAKTU TERHADAP PENJADWALAN DENGAN MENGGUNAKAN PROGRAM PRIMAVERA PROJECT PLANNER 3.0 PADA PROYEK PEMBANGUNAN GEDUNG PKK PEMPROP. KALSEL (TAHAP I)

Main Author: MUDATARUNA, EMIR SYARIEF
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2009
Subjects:
Online Access: http://eprints.umm.ac.id/8371/1/EVALUASI_BIAYA_DAN_WAKTU_TERHADAP_PENJADWALAN_DENGAN_MENGGUNAKAN_PROGRAM_PRIMAVERA_PROJECT_PLANNER_3.pdf
http://eprints.umm.ac.id/8371/
Daftar Isi:
  • Be in contemplation project that gets complex character therefore needful a good management so makes easy deep performing so project get well-oiled and timely. The need resource factor has to be taken into account to reduce its happening resource to settle that thing needs to mark sense labour generalization. To make easy deep arranges schedule, analysing job network and resource management utilized by computers assistive tool which as software of Primavera Project Planner's package 3.0 so acquired outgrows optimal budgets and optimal times. Base arithmetic morphological result one is done by use of Primavera Project Planner's program 3.0 gotten by durasi or full scale execution time up to 144 days. Project total cost of analysis Primavera Project Planner 3.0 are as big as Rp 3.126.948.440,19 (not including contractor and VAT gain 10%) one that up on year unit price 2007. Of analysis result Primavera Project Planner 3.0 available a few things which shall be noticed before does data input which is have to be made by dependable relationship diagram that logical squire talks shop so get to result good work schedule and not chaotic on its performing and also before does operation and resource amount generalization that is utilized, better beforehand acknowledged total volume that worked by total available resource regubrly notice ability each that resource.