PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON

Main Author: SISWANTO, ABDUL GOFUR HADI
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2008
Subjects:
Online Access: http://eprints.umm.ac.id/7785/1/PERENCANAAN_ULANG.pdf
http://eprints.umm.ac.id/7785/
ctrlnum 7785
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/7785/</relation><title>PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON</title><creator>SISWANTO, ABDUL GOFUR HADI</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>The planning of Arc Bridge to give upper structures construction system is strong and displacement is very small. The covers of This planning is how many dimension and reinforcement needed for floor carriage, floor beam, vertical beam, and arc beam. Based calculation of planning of arc is bending moment and axial force combination. Total payload flattens working q = 9662 t/m ' and point load P = 22752 tons . Maximum moment happened is (Mu) = 47807 tm', axial force happened is ( Pu) = 588281 tons. Planning of arc bridge with length 25 m and width 8 m is got result of planning for example for floor beam length, unfolds cleanness 3160 mm, concrete dimension 300 x 500 ( mm), reinforcement at fulcrums area is used 5 &#xD8; 25 and at field area is used 4 &#xD8; 25, to stirrup area is used &#xD8; 12. For athwart beam, unfolds cleanness 5700 mm with concrete dimension 500 x 750 ( mm), reinforcement at fulcrums area is used 10 &#xD8; 25, at field area is used 6 &#xD8; 25, to stirrup area is used &#xD8; 12. For vertical beam is got concrete dimension 500 x 500 ( mm), reinforcement is used 8 &#xD8; 25 attached symmetrical. For arc is got concrete dimension 550 x 1200 ( mm),reinforcement is used 28 &#xD8; 25. to stirrup area is used &#xD8; 12.</description><date>2008</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/7785/1/PERENCANAAN_ULANG.pdf</identifier><identifier> SISWANTO, ABDUL GOFUR HADI (2008) PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON. Other thesis, University of Muhammadiyah Malang. </identifier><recordID>7785</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author SISWANTO, ABDUL GOFUR HADI
title PERENCANAAN ULANG (REDESIGN) STRUKTUR ATAS JEMBATAN KAMPUS III UNIVERSITAS MUHAMMADIYAH MALANG DENGAN METODE JEMBATAN BUSUR BETON
publishDate 2008
topic TA Engineering (General). Civil engineering (General)
url http://eprints.umm.ac.id/7785/1/PERENCANAAN_ULANG.pdf
http://eprints.umm.ac.id/7785/
contents The planning of Arc Bridge to give upper structures construction system is strong and displacement is very small. The covers of This planning is how many dimension and reinforcement needed for floor carriage, floor beam, vertical beam, and arc beam. Based calculation of planning of arc is bending moment and axial force combination. Total payload flattens working q = 9662 t/m ' and point load P = 22752 tons . Maximum moment happened is (Mu) = 47807 tm', axial force happened is ( Pu) = 588281 tons. Planning of arc bridge with length 25 m and width 8 m is got result of planning for example for floor beam length, unfolds cleanness 3160 mm, concrete dimension 300 x 500 ( mm), reinforcement at fulcrums area is used 5 Ø 25 and at field area is used 4 Ø 25, to stirrup area is used Ø 12. For athwart beam, unfolds cleanness 5700 mm with concrete dimension 500 x 750 ( mm), reinforcement at fulcrums area is used 10 Ø 25, at field area is used 6 Ø 25, to stirrup area is used Ø 12. For vertical beam is got concrete dimension 500 x 500 ( mm), reinforcement is used 8 Ø 25 attached symmetrical. For arc is got concrete dimension 550 x 1200 ( mm),reinforcement is used 28 Ø 25. to stirrup area is used Ø 12.
id IOS4109.7785
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:40:54Z
last_indexed 2017-03-21T02:40:54Z
recordtype dc
_version_ 1675924134268239872
score 17.538404