PERENCANAAN KESEIMBANGAN LINTASAN DENGAN MENGGUNAKAN METODE RANK POSITION WEIGHT DANREGION APPROACH GUNA MENINGKATKAN EFISIENSI KERJA DAN OUTPUT PRODUKSI (Studi Kasus Pada Perusahaan Eternit cap WALET)

Main Author: SYAMSUDIN, M N
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2008
Subjects:
Online Access: http://eprints.umm.ac.id/7633/1/PERENCANAAN_KESEIMBANGAN_LINTASANDENGANMENGGUNAKANMETODE_RANK_POSITION_WEIGHT_DANREGION_APPROACH_GUNA_MENINGKATKAN_EFISIENSI_KERJA_DANOUTPUT_PRODUKSI.pdf
http://eprints.umm.ac.id/7633/
ctrlnum 7633
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/7633/</relation><title>PERENCANAAN KESEIMBANGAN LINTASAN DENGAN MENGGUNAKAN METODE RANK POSITION WEIGHT DANREGION APPROACH GUNA MENINGKATKAN EFISIENSI KERJA DAN OUTPUT PRODUKSI (Studi Kasus Pada Perusahaan Eternit cap WALET)</title><creator>SYAMSUDIN, M N</creator><subject>T Technology (General)</subject><description>Problems of line balancing in in a produce often disregarded by company, eventhough problem of trajectory balance represent one important thing in accomplishment of produce goals which have been planned. Company of&#xD; Plasterboard brand WALET that located in Lawang Malang, represent company that produced various plasterboard type. Problems faced by this company is the company frequently cannot fulfill request of consumer caused by lowering sum up production consequences by less of balanced production line &#xD; In the effort of finishing the problems, the method that used is Rank Positional Weight (RPW) method and Region Approach (RA) method that representing of heuristic with approach of trial and error. Efficiency analysis that&#xD; done to compare early condition with condition after applying the method of line balancing at company include balance delay, line efficiency, and output production.&#xD; Based on result analysis from both method got result of calculation early balance delay 49.55% decreased to 16.42% with method of Rank Positional Weight (RPW) and 15.27% with method of Region Approach (RA). While efficiency of line&#xD; from early condition equal to 50.45% increased to 83.58% with method of Rank Positional Weight (RPW) and 84.73% with method of Region Approach (RA).&#xD; Produce output of plasterboard increase from early condition 5.200 sheet / month become 7.592 sheet / month with method of Rank Positional Weight (RPW) and 84.73% with method of Region Approach (RA). Produce output of plasterboard increased from early condition 5.200 sheet / month become 7.592 sheet / month with method of Rank Positional Weight (RPW) and 7.696 sheet / month with method of Region Approach (RA). . With this improvement, company can fulfill request of consumer and the two method can be used in trouble-shooting of line balance to increase productivity in Company of Plasterboard brand WALET</description><date>2008</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/7633/1/PERENCANAAN_KESEIMBANGAN_LINTASANDENGANMENGGUNAKANMETODE_RANK_POSITION_WEIGHT_DANREGION_APPROACH_GUNA_MENINGKATKAN_EFISIENSI_KERJA_DANOUTPUT_PRODUKSI.pdf</identifier><identifier> SYAMSUDIN, M N (2008) PERENCANAAN KESEIMBANGAN LINTASAN DENGAN MENGGUNAKAN METODE RANK POSITION WEIGHT DANREGION APPROACH GUNA MENINGKATKAN EFISIENSI KERJA DAN OUTPUT PRODUKSI (Studi Kasus Pada Perusahaan Eternit cap WALET). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>7633</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author SYAMSUDIN, M N
title PERENCANAAN KESEIMBANGAN LINTASAN DENGAN MENGGUNAKAN METODE RANK POSITION WEIGHT DANREGION APPROACH GUNA MENINGKATKAN EFISIENSI KERJA DAN OUTPUT PRODUKSI (Studi Kasus Pada Perusahaan Eternit cap WALET)
publishDate 2008
topic T Technology (General)
url http://eprints.umm.ac.id/7633/1/PERENCANAAN_KESEIMBANGAN_LINTASANDENGANMENGGUNAKANMETODE_RANK_POSITION_WEIGHT_DANREGION_APPROACH_GUNA_MENINGKATKAN_EFISIENSI_KERJA_DANOUTPUT_PRODUKSI.pdf
http://eprints.umm.ac.id/7633/
contents Problems of line balancing in in a produce often disregarded by company, eventhough problem of trajectory balance represent one important thing in accomplishment of produce goals which have been planned. Company of Plasterboard brand WALET that located in Lawang Malang, represent company that produced various plasterboard type. Problems faced by this company is the company frequently cannot fulfill request of consumer caused by lowering sum up production consequences by less of balanced production line In the effort of finishing the problems, the method that used is Rank Positional Weight (RPW) method and Region Approach (RA) method that representing of heuristic with approach of trial and error. Efficiency analysis that done to compare early condition with condition after applying the method of line balancing at company include balance delay, line efficiency, and output production. Based on result analysis from both method got result of calculation early balance delay 49.55% decreased to 16.42% with method of Rank Positional Weight (RPW) and 15.27% with method of Region Approach (RA). While efficiency of line from early condition equal to 50.45% increased to 83.58% with method of Rank Positional Weight (RPW) and 84.73% with method of Region Approach (RA). Produce output of plasterboard increase from early condition 5.200 sheet / month become 7.592 sheet / month with method of Rank Positional Weight (RPW) and 84.73% with method of Region Approach (RA). Produce output of plasterboard increased from early condition 5.200 sheet / month become 7.592 sheet / month with method of Rank Positional Weight (RPW) and 7.696 sheet / month with method of Region Approach (RA). . With this improvement, company can fulfill request of consumer and the two method can be used in trouble-shooting of line balance to increase productivity in Company of Plasterboard brand WALET
id IOS4109.7633
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:40:50Z
last_indexed 2017-03-21T02:40:50Z
recordtype dc
_version_ 1675924133499633664
score 17.538404