STUDI PERENCANAAN INSTALASI AIR PADA TERMINAL BARU KOTA NGAWI JAWA TIMUR

Main Author: WARDANA, ARIES YUNI
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2008
Subjects:
Online Access: http://eprints.umm.ac.id/6905/1/STUDI_PERENCANAAN_INSTALASI_AIR_PADATERMINAL_BARU_KOTA_NGAWIJAWA_TIMUR.pdf
http://eprints.umm.ac.id/6905/
Daftar Isi:
  • Town expanding to have good transportation system, [is] for that needed [by] a[n supporter prasarana in this case [is] terminal. Condition a good building have water installation distributing clean water to its consumer and or conduct rainwater pond. Because of each;every pattern activity of human being [do] not escape amount of water required will be clean, hence needed [by] planning of water installation which supporting the problems To get a[n planning of water installation which is [is] good to be needed [by] supporter datas that is; rainfall data, map of contour as well as plan site / building masterplan, and also consumer data to consume clean water. In planning how much/many amount of consumer of terminal which consuming water [in] assuming pursuant to amount of vehicle operating on terminal of Ngawi [So that/ to be] installation irrigate this can fulfill its plan age hence for the calculation of consumer of [counted/calculated] terminal pursuant to amount of vehicle operating have to be projected according to age plan with extrapolation formula. From result of calculation, obtained [by] Rainfall device of R10Th 127.458mm. Totalizeing used clean amount of water required 26402.78 l / hr, total [of] water waste which [is] castaway 19802.09 l / hr. Using 3 type pump of setrifugal used to lift water of ground reservoir where its water stem from Deep Well to reservoir to the. To distribute water to consumer of tandon to the by exploiting Gravitation style.