PERENCANAAN EMBUNG PROPOK DI LOMBOK BARAT NTB
Main Author: | Burhanuddin, Burhanuddin |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2006
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/6687/1/PERENCANAAN_EMBUNG_PROPOK_DI_LOMBOK_BARATNTB.pdf http://eprints.umm.ac.id/6687/ |
ctrlnum |
6687 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/6687/</relation><title>PERENCANAAN EMBUNG PROPOK DI LOMBOK BARAT NTB</title><creator>Burhanuddin, Burhanuddin</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Smalldam are more common name of a dam or reservoir that serves a small scale to store rainwater in a pond and then operated during the dry season for a variety of needs based on the potential of adequate water and sustained natural conditions in the study area is adequate, it is possible dibangunya a embung. The basic principle of planning embungs homogeneous soil type urugan is the danger of over-topping, sembulan (Bolling) and sufosi (piping) and stability is the key to the success ofdevelopment of a embung . The results obtained planning Q100 outflow discharge of 52,468 m3/sec with a water level of +102,579 m and height of 3325 m. surveillance So the summit elevation of +104,725 m embungs Transverse dimensions obtained embung at tree top embungs 6 m wide, slope embung in the upper 1: 3 while in the downstream part 1: 2.</description><date>2006</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/6687/1/PERENCANAAN_EMBUNG_PROPOK_DI_LOMBOK_BARATNTB.pdf</identifier><identifier> Burhanuddin, Burhanuddin (2006) PERENCANAAN EMBUNG PROPOK DI LOMBOK BARAT NTB. Other thesis, University of Muhammadiyah Malang. </identifier><recordID>6687</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Burhanuddin, Burhanuddin |
title |
PERENCANAAN EMBUNG PROPOK DI LOMBOK BARAT NTB |
publishDate |
2006 |
topic |
TA Engineering (General). Civil engineering (General) |
url |
http://eprints.umm.ac.id/6687/1/PERENCANAAN_EMBUNG_PROPOK_DI_LOMBOK_BARATNTB.pdf http://eprints.umm.ac.id/6687/ |
contents |
Smalldam are more common name of a dam or reservoir that serves a small scale to store rainwater in a pond and then operated during the dry season for a variety of needs based on the potential of adequate water and sustained natural conditions in the study area is adequate, it is possible dibangunya a embung. The basic principle of planning embungs homogeneous soil type urugan is the danger of over-topping, sembulan (Bolling) and sufosi (piping) and stability is the key to the success ofdevelopment of a embung . The results obtained planning Q100 outflow discharge of 52,468 m3/sec with a water level of +102,579 m and height of 3325 m. surveillance So the summit elevation of +104,725 m embungs Transverse dimensions obtained embung at tree top embungs 6 m wide, slope embung in the upper 1: 3 while in the downstream part 1: 2. |
id |
IOS4109.6687 |
institution |
Universitas Muhammadiyah Malang |
institution_id |
136 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Muhammadiyah Malang |
library_id |
546 |
collection |
UMM Institutional Repository |
repository_id |
4109 |
city |
MALANG |
province |
JAWA TIMUR |
repoId |
IOS4109 |
first_indexed |
2017-03-21T02:40:31Z |
last_indexed |
2017-03-21T02:40:31Z |
recordtype |
dc |
_version_ |
1675924127504924672 |
score |
17.538404 |