PERENCANAAN JARINGAN DISTRIBUSI AIR BAKU DI EMBUNG SUKODONO KECAMATAN PANCENG KABUPATEN GRESIK
Main Author: | Iswana, Deny Ezra |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2020
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/58593/7/PENDAHULUAN.pdf http://eprints.umm.ac.id/58593/1/BAB%201.pdf http://eprints.umm.ac.id/58593/4/BAB%202.pdf http://eprints.umm.ac.id/58593/2/BAB%203.pdf http://eprints.umm.ac.id/58593/6/BAB%204.pdf http://eprints.umm.ac.id/58593/3/BAB%205.pdf http://eprints.umm.ac.id/58593/5/LAMPIRAN.pdf http://eprints.umm.ac.id/58593/ |
Daftar Isi:
- The need for proper water in community life is still not felt by residents in the Panceng District and the Shaman District of Gresik Regency. To overcome this, a good water distribution plan is needed so that it can meet the water needs of the population in the District. Sukodono Embung Development, located in Panceng Sub-District, Gresik Regency, is expected to meet the water needs for irrigation and water needs for the population. With the planned Water Treatment Plant (IPAL) in Embung Sukodono with a capacity of 30-40 liters / second, it is expected to meet the distribution of raw water to 9 villages with a population of 24803 people located in Panceng Subdistrict and Shaman Subdistrict. The water distribution pipeline is planned to pass through the connecting road tracts in each village so that it is easy to install and maintain with a Branch / Netting type network scheme and the pipe dimensions are planned to start in dimensions of 12 inches - 4 inches with Ductile Iron and PVC material. Water distribution planning is planned until 2039 with a percentage of population growth of 0.87% and raw water needs to reach 35.93 liters /second in 2039. Planning and calculating the distribution of raw water using the WaterCAD software.