Perencanaan Agregat Dengan Menggunakan Metode Linier Programming Dalam Menyusun Jadwal Induk Produksi Yang Optimal (Study Kasus Di PT. Karya Agung Nusantara - Sidoarjo)

Main Author: ARIYANTO, HENDRA
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2010
Subjects:
Online Access: http://eprints.umm.ac.id/581/1/Perencanaan_Agregat_Dengan_Menggunakan_Metode_Linier_Programming_Dalam_Menyusun_Jadwal_Induk_Produksi_Yang_Optimal.pdf
http://eprints.umm.ac.id/581/
Daftar Isi:
  • A Planning of Master Production Schedule used Linear Programming has purpose for arranging system that can produce the optimal output of price. One of the step that was done for arraging Master Production Schedule was created Agregat Planning by smallest consider MAPE. After demand of prediction, we have known, the next steps were developing of model with function of purpose and the limitation of request until arranged the formulation that concern efficiency to next step was running of software Quantitative System method that used Linear Programming which was produced optimal of Agregat Planning until arraging Master Production Schedule was done. However, the object of research was pt. Karya Agung Nusantara that was place in Sidoarjo. This enterprice be produce shoes which in his campaign has many constraints to determine the best production planning by minimalizing work done outside of normal working hours. The planning of Master Production Schedule used Linear Programming was submitted on enterprise for producing efficiency act was to lower product price. By applying Master Production Schedule can can economical price Rp 83.1096.900,- Keyword : Linear Programming, Agregat Planning, Master Production Schedule