PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING STRUKTUR UTAMA DENGAN METODE KONVENSIONAL DN SISTEM FERI (STUDI KASUS PADA PEMBANGUNAN GEDUNG LABORATORIUM TERPADU UNIVERSITAS MUHAMMADIYAH PONOROGO)
Daftar Isi:
- Generally, civil construction begins with the structural stage. Structural stage is the most important stage since it determines the resistance of the building based on the working life in receiving both internal and external load. In a construction, a method is required to execute the plan based on the targeted time, quality, and cost. Formwork planning is an important part of the implementation of reinforced concrete structure. This study aimed to compare the PERI-based formwork method with the conventional formwork method in the construction of Integrated Laboratory of Universitas Muhammadiyah Ponorogo. The results showed that the PERI-based formwork required IDR 1.935.492.035 with duration of 25 days. Meanwhile, the conventional formwork required IDR 1.893.224.812 with duration of 57 days. Thus, the conventional method was IDR 42.267.223 cheaper than the PERI system.