STUDI PERENCANAAN BANGUNAN PELIMPAH PADA BENDUNGAN BULIA KABUPATEN GORONTALO
Main Author: | Hamdi, Rafi’i |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2008
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/4500/1/STUDI_PERENCANAAN_BANGUNAN_PELIMPAH_PADABENDUNGAN_BULIA_KABUPATEN_GORONTALO.pdf http://eprints.umm.ac.id/4500/ |
Daftar Isi:
- Plan of study area at Huluya, State of Gorontalo. Most of people is a farmer. Agriculture area which used is a rain full area, so in the dry season this area is still waterless. (Antecedent module of Study of eligibility of Bulia Long stage, PT. Amythas & Associates: 5) So, strive of Bulia Long stage build plan, will give a direct income for local people. Especially for developing of irrigation system was made technically. In that case, harvest could be done in three times in a year. The final result of this planning, expected will get an optimal condition in water potency exploiting. To build a long stage, we can’t overrule the Spillway Building. Spillway building plan is not a self planning, but it’s a part of Bulia Long stage development project, though this spill way building is a vital building which can determine a benefit an target of Bulia Long stage Development Project.