ANALISIS PENGENDALIAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF UNTUK MEMAKSIMALKAN WAKTU DAN ANGGARAN BIAYA PADA PERENCANAAN PEMBANGUNAN NEO CONDOTEL BY ASTON KOTA BATU
Main Author: | Ramadhan, Harri Mulyo |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2018
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/42887/1/PENDAHULUAN.pdf http://eprints.umm.ac.id/42887/2/BAB%20I.pdf http://eprints.umm.ac.id/42887/3/BAB%20II.pdf http://eprints.umm.ac.id/42887/4/BAB%20III.pdf http://eprints.umm.ac.id/42887/5/BAB%20IV.pdf http://eprints.umm.ac.id/42887/6/BAB%20V.pdf http://eprints.umm.ac.id/42887/7/Lampiran.pdf http://eprints.umm.ac.id/42887/ |
Description not available. |