PERENCANAAN TEBAL PERKERASAN KAKU (RIGID PAVEMENT) DAN RENCANA ANGGARAN BIAYA PADA RUAS JALAN KAMPUNG SIRE - KOKAS KABUPATEN MAYBRAT, PROVINSI PAPUA BARAT (STA 0+000 – 3+050)

Main Author: Rosmana, Dede
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2018
Subjects:
Online Access: http://eprints.umm.ac.id/41453/1/PENDAHULUAN.pdf
http://eprints.umm.ac.id/41453/2/BAB%20I.pdf
http://eprints.umm.ac.id/41453/3/BAB%20II.pdf
http://eprints.umm.ac.id/41453/4/BAB%20III.pdf
http://eprints.umm.ac.id/41453/5/BAB%20IV.pdf
http://eprints.umm.ac.id/41453/6/BAB%20V.pdf
http://eprints.umm.ac.id/41453/7/Lampiran.pdf
http://eprints.umm.ac.id/41453/
ctrlnum 41453
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/41453/</relation><title>PERENCANAAN TEBAL PERKERASAN KAKU (RIGID&#xD; PAVEMENT) DAN RENCANA ANGGARAN BIAYA PADA RUAS JALAN KAMPUNG SIRE - KOKAS KABUPATEN MAYBRAT, PROVINSI PAPUA BARAT (STA 0+000 &#x2013; 3+050)</title><creator>Rosmana, Dede</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Sire - Kokas village road, in general is a road that connects between Maybrat and Sorong regencies in the province of West Papua. In this final project is planned road work by using rigid pavement on Sire - Kokas village road. With the beginning of the age of the plan to increase the number of vehicles in 2018, for the planning of rigid pavement thickness (rigid) by using Road Pavement Planning Guidelines Method DGH. &#xD; From the calculation of the planning on Sire &#x2013; Kokas village road, for the thickness of the planning of the road with the age of 20 year plan, the thickness of Concrete Slab Rigid Pavement (18 cm) with K-350 concrete and thickness of the Base Layer Bottom Lean Mix Concrete (10 cm) using K-125 concrete, with 24% base ground CBR. Iron used as follows: Ruji dowel &#x2205; 25 mm, length 450 mm, distance 300 mm, tie bars &#x2205; 12 mm, length 600 mm, distance 750 mm. The required cost is Rp. 41.630.008.000,00 (Forty One Billion Seven Hundred Seven Million Three Hundred Forty Five Thousand Rupiah</description><date>2018-02</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/1/PENDAHULUAN.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/41453/7/Lampiran.pdf</identifier><identifier> Rosmana, Dede (2018) PERENCANAAN TEBAL PERKERASAN KAKU (RIGID PAVEMENT) DAN RENCANA ANGGARAN BIAYA PADA RUAS JALAN KAMPUNG SIRE - KOKAS KABUPATEN MAYBRAT, PROVINSI PAPUA BARAT (STA 0+000 &#x2013; 3+050). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang. </identifier><recordID>41453</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Rosmana, Dede
title PERENCANAAN TEBAL PERKERASAN KAKU (RIGID PAVEMENT) DAN RENCANA ANGGARAN BIAYA PADA RUAS JALAN KAMPUNG SIRE - KOKAS KABUPATEN MAYBRAT, PROVINSI PAPUA BARAT (STA 0+000 – 3+050)
publishDate 2018
topic TA Engineering (General). Civil engineering (General)
url http://eprints.umm.ac.id/41453/1/PENDAHULUAN.pdf
http://eprints.umm.ac.id/41453/2/BAB%20I.pdf
http://eprints.umm.ac.id/41453/3/BAB%20II.pdf
http://eprints.umm.ac.id/41453/4/BAB%20III.pdf
http://eprints.umm.ac.id/41453/5/BAB%20IV.pdf
http://eprints.umm.ac.id/41453/6/BAB%20V.pdf
http://eprints.umm.ac.id/41453/7/Lampiran.pdf
http://eprints.umm.ac.id/41453/
contents Sire - Kokas village road, in general is a road that connects between Maybrat and Sorong regencies in the province of West Papua. In this final project is planned road work by using rigid pavement on Sire - Kokas village road. With the beginning of the age of the plan to increase the number of vehicles in 2018, for the planning of rigid pavement thickness (rigid) by using Road Pavement Planning Guidelines Method DGH. From the calculation of the planning on Sire – Kokas village road, for the thickness of the planning of the road with the age of 20 year plan, the thickness of Concrete Slab Rigid Pavement (18 cm) with K-350 concrete and thickness of the Base Layer Bottom Lean Mix Concrete (10 cm) using K-125 concrete, with 24% base ground CBR. Iron used as follows: Ruji dowel ∅ 25 mm, length 450 mm, distance 300 mm, tie bars ∅ 12 mm, length 600 mm, distance 750 mm. The required cost is Rp. 41.630.008.000,00 (Forty One Billion Seven Hundred Seven Million Three Hundred Forty Five Thousand Rupiah
id IOS4109.41453
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2019-05-07T01:46:25Z
last_indexed 2019-05-07T01:46:25Z
recordtype dc
_version_ 1675924491565268992
score 17.538404