STUDI PERENCANAAN TEMPAT PEMBUANGAN AKHIR SAMPAH (TPA) PADA TOPOGRAFI EKSTRIM DI DESA DONOWARIH KECAMATAN KARANG PLOSO KABUPATEN MALANG
Main Author: | Hapsari, Ayudia Yuninur |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2009
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/3589/1/STUDI_PERENCANAAN_TEMPAT_PEMBUANGAN_AKHIRSAMPAH.pdf http://eprints.umm.ac.id/3589/ |
Daftar Isi:
- The village has a management Donowarih poor waste management, then the landfill can be said planning is important, so the purpose of this study is to know To know the volume of waste that can be accommodated, find a good design is technically in the planning cell design, knowing the results of slope stability analysis of the power cell design, knowing the system design, to meet the needs of the processing the end of a waste, in this case is water leachate. Waste disposal method used is a method of controlled landfill which is an increase of open dumping, where a periodic garbage that has piled up covered with a layer of soil to reduce potential environmental disruption caused. From the calculation results obtained for a total timbulan garbage 2.5375 m3/hari. To obtain cell capacity value of 2470 m3 volume, so age of cells obtained 15-year plan. Gas extraction system used is passive-vertical as potential gas wells relative kecil.Dimana construction of four gas wells with a connection that is used is a piping utama.Dari results of stabiltas talud planning, the value obtained FS for 3020 FSguling = 4:04, FSgeser = 1.81, qall = 26,453, qtoe = 21,543. Keselurahan long bak pengendap (settling pond) is 6.60 m where length of each tub is 2:20 m to 5:30 m wide. While Tub depth pengendap (settling pond) is 2 m.