STUDI PERENCANAAN TUBUH BENDUNGAN PADA BENDUNGAN BULIA DI KABUPATEN GORONTALO

Main Author: AISY, NURUL
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2007
Subjects:
Online Access: http://eprints.umm.ac.id/3541/1/STUDI_PERENCANAAN_TUBUH_BENDUNGAN_PADA_BENDUNGANBULIA_DI_KABUPATEN_GORONTALO.pdf
http://eprints.umm.ac.id/3541/
Daftar Isi:
  • Dam is a large-scale storage function for hold water in a reservoir and then operated during the dry season for various needs based on water poteni yag enough and sustained natural conditions in the study area is adequate, it is possible in the awakening of a dam. The basic principle of planning Dam Type urugan homogeneous soil is against the dangers of over-topping, sembulan (Boilling) and sufosi (piping) and stability is the key to success of the construction of a dam. Planning results in Q100 outflow amounted to 107,083 m3 / with high water + 127 812 m and a height of 5 m surveillance so that the elevation of the weir lighthouse of + 131.00 m. Transverse dimension of 7.5 m. The slope of the dam on the upstream side 1: 3 while in the downstream part 1: 2.