PERANCANGAN TURBIN BULB yang MEMPUNYAI HEAD 2 m dan DEBIT 1 m^3/s

Main Author: RATNO, RIKI DWI
Format: Thesis NonPeerReviewed
Terbitan: , 2013
Subjects:
Online Access: http://eprints.umm.ac.id/16104/
Daftar Isi:
  • Electrics was one of the main necessities for society and industry, most of production and home appliances used electric power. The purpose of this design that will be achieved was get bulb turbine design that implementable for electricity plant at Tegalgondo. The reason for bulb turbine electricity plant, was because no need much cost for plant installation. One of the untapped natural potential was to ditch in the Brantas River, which flows across the complex campus III UMM which has a debit 1.25 m^3/s with head 2 meter, so it can be used to generate electrical energy used the water turbine to fulfill the energy needs of the population in surrounding areas. Design this bulb turbine are including the design of the main component of bulb turbine such of runner blade, guide vane, diameter shaft, and cotter pin. Bulb turbine was designed with debit 1 m^3/s and head 2 meters was obtained from the head effective installation. As for the acquired among others result of count outlet diameter runner D_1=650 mm Hub (D_N)=320 mm, high of guide vane (B)= 3,4 cm, number of blades (Z)=8 , distance between runner and guide vane (b_0)=220 mm, total blade guide vane (z_GV)=8 , and diameter shaft ds=60 mm.