PERENCANAAN DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU PRODUK SHUTTLECOCK DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) (Studi Kasus Pada UD Bella Shuttlecocks, Pakisaji - Malang)

Main Author: WIDYAWANTO, HENDRIK
Format: Thesis NonPeerReviewed
Terbitan: , 2011
Subjects:
Online Access: http://eprints.umm.ac.id/15685/
Daftar Isi:
  • UD. Bella Shuttlecocks - Malang represent peripatetic company of manufacture. UD. Bella Shuttlecocks - Malang produce badminton shuttlecocks pursuant to request of consumer like AAS Biru, AAS Orange, AAS Merah. Problems which is facing by UD. Bella Shuttlecocks - Malang is how to plans and controls raw material inventory in order to abble fulfilling the demand and minimizing material inventory cost. To overcome problems above, hence one of its alternative to through planning of raw material by using method of Material Requirement Planning (MRP). From result of data processing with MRP system with lotsize EOQ, company can cost effective equal to Rp. 4.389.050,- (25,34%). With cost-saving, company of allocation can to other expense type without lessening the quality of itself product