PENENTUAN BATCH SIZE PRODUKSI, LOT SIZE PEMESANAN BAHAN BAKU,FREKUENSI PENGIRIMAN PRODUK JADI DAN BAHAN BAKU UNTUK MEMINIMALKAN TOTAL BIAYA PENGADAAN DAN PRODUKSI (Studi Kasus PT. Daeyang Rollent Indonesia)
Main Author: | Firgautama, Nizar |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
, 2011
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/15595/ |