ANALISIS ALIRAN BEBAN PADA PEMBANGKIT INTEGRASI PLTMH DAN PLTS DI UNIVERSITAS MUHAMMADIYAH MALANG

Main Author: Tirtana, Muhammad Arief
Format: Thesis NonPeerReviewed
Terbitan: , 2013
Subjects:
Online Access: http://eprints.umm.ac.id/15454/
Daftar Isi:
  • PLTMH generating system integrated with PLTS located on the campus of University of Muhammadiyah Malang III characteristics during the summer when the water flow is reduced, which causes power capacity supplied with PLTMH decreased. Power supply capacity will be improved by solar, solar power generator only interconnected to the PLTMH in phase S. PLTMH distribution network aided by the power of electricity to meet the needs of the campus load GKB1 building and ICT. Load flow analysis aims to obtain information on the flow of active power, reactive power, and voltage on the bus at the time of integration generator full load condition. To know the power and voltage then conducted data collection stations and network capacity. ETAP Power Station 7.0.0 program used to determine the output power and voltage distribution network is PLTMH interconnected with PLN or interconnected with Genset. Repairs performed power flow allocation in the placement of capacitor banks to improve cosphi GKB1 panel on the network of plants.