ANALISA BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG

Main Author: SANI, IKTIVA
Format: Thesis NonPeerReviewed
Terbitan: , 2014
Subjects:
Online Access: http://eprints.umm.ac.id/15319/
Daftar Isi:
  • Implementation of Development Projects Aston Paramount delayed completion time caused by the discharge of water continuously from the underground, thus inundating the area GWT (Ground Water Tank), STP (Sewage Treatment Plan) and the destruction of Tower Crane. This can be seen by time schedule project in November 2012 or at the time the project reaches 17 weeks, the progress of the plan should reach 28.648%, but the reality on the ground has reached 24.194%, so it can be seen -4.454% deviation. In this thesis applied Method Time Cost Trade Off ( TCTO ) to speed up the implementation of the project in order to achieve such a time schedule for the remaining work on the original plan. TCTO an exchange of time and costs with a view to speeding up the duration. Acceleration time is done by holding the shift work. Of the project schedule has been delayed, the rest of the project is completed within 180 days with a total cost of Rp.32,679,810,571.24. Meanwhile, if the project is accelerated by using TCTO to return to the original plan schedule is 162 days obtained a cost of Rp.33,462,446,260, the difference between the cost of Rp.782,635,689.88.