STUDI PRODUKTIVITAS TRUK PENGANGKUT SAMPAH KOTA BATU

Main Author: NUGRAHA, OKI RAHAFISTA
Format: Thesis NonPeerReviewed
Terbitan: , 2014
Subjects:
Online Access: http://eprints.umm.ac.id/15273/
Daftar Isi:
  • Batu City is a city that has the potential to deal with the garbage that is less efficient. With the status of the Batu City Town Tourism, waste must be transported properly because cleanliness is a necessary prerequisite. Truck carrying garbage in Batu City is 5 units Arm Roll Truck and Dump Truck 4 units, existing conditions shows the average hours worked Arm Roll Truck is 6.07 hours/day, while the Dump Truck is 2.84 hours/day. This study was conducted in order to determine the productivity of trucks carrying garbage in Batu City, operation can be calculated using empirical methods. The volume of the garbage that brought is divided by the operational time m3/rit, then accumulated become m3/day, then it is conversion become m3/hours. The average productivity of 5 units Arm Roll Truck is 9.22 m3/hr, equivalent 47.617 m3/day/truck, with an average working hours effective 5.24 hours/day. While the average 4 units Dump Trucks productivity is 7.90 m3/hours, equivalent to 20.79 m3/day/truck, average hours worked effective 2.66 hours/day. Based on standard working hours 8 hours/day,(effective 7 hours/day), average productivity of 4 units Arm Roll Truck is 8.65 m3/hr, equivalent 59.52 m3/day/truck, with an average working hours effective 6.87 hours/day. While the average 2 units Dump Trucks productivity is 7.63 m3/hours, equivalent to 41.58 m3/day/truck, average hours worked effective 5.43 hours/day.