PERENCANAAN PEMBANGUNAN SUMUR RESAPAN UNTUK PENANGGULANGAN LIMPASAN PERMUKAAN DI DAERAH PERUMNAS MADE KEC. LAMONGAN KAB. LAMONGAN

Main Author: AZZA, ADRIANO
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2010
Subjects:
Online Access: http://eprints.umm.ac.id/1512/1/PERENCANAAN_PEMBANGUNAN_SUMUR_RESAPAN_UNTUKPENANGGULANGAN_LIMPASAN_PERMUKAANDI_DAERAH_PERUMNAS_MADE_KEC.pdf
http://eprints.umm.ac.id/1512/
Daftar Isi:
  • In the big cities in Indonesia have experienced two opposite things, flooding and ground water level decline. So also happened in Housing Made every rainy season often stagnant water to prevent it and also to maintain the required reserves of water absorption wells Building form of water infiltration in this study is the absorption wells. Recharge wells could be called an artificial ground water charging is technically attempt to enter the water from the surface into the soil to reduce runoff and increase soil water potential. Discharge into the building of this infiltration is a discharge that comes from rainwater that falls on the roof and in the yard. Construction of infiltration wells in the study is planned to be constructed in every house. Where the total volume of rain water hourly with kala re-registration for 2 years is = 2627.468 m3 while the total volume amounted to 3022.5 m3 absorption wells. So the pool of which occurred in the Housing Made could be addressed at once to increase the potential for soil This thesis is aimed at providing input to the community residents and the Local Government Housing Made Lamongan, because of time constraints, the need for further studies using other methods to cope with inundation that occurred in the area of housing Housing Made a disturbing environment and still necessary to not leave water conservation