PERENCANAAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PEMANAS (HEATER) PADA MESIN PLATE HIGH EXCHANGER DENGAN MENGGUNAKAN ANALISA TEKNIK KEANDALAN (Studi kasus KUD ‘DAU’)

Main Author: SUNARKO, HERI
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2010
Subjects:
Online Access: http://eprints.umm.ac.id/1283/1/PERENCANAAN_INTERVAL_WAKTU_PENGGANTIAN_KOMPONEN_PEMANAS.pdf
http://eprints.umm.ac.id/1283/
Daftar Isi:
  • This Research in doing Januari 2010, to collect damage data and data of expense from component pemanas (Heater) at machine plate high exchanger. Intention of this research to obtain; get time interval treatment of exact at machine of plate high exchanger, lessening the expense of treatment and repair of machine and also improve reliability at machine of plate high exchanger. With applying of model age replacement, determination of international replacement which proposed applicable at company utilize to degrade the expense of replacement of component. With this model have in determining international anti to component of pemanas (Heater) that is 23 day with machine reliability storey; level equal to 0,719 so that in a period of year 2008 - 2009 there are cost-saving equal to Rp. 59.679.376,4 with C(Tp) old Rp. 88.395.856,4 and C(Tp) new of Rp 28.716.480,- Key Word : Reliability, Age Replacement, Replacement.