PENJADWALAN WAKTU OPTIMAL PENGGANTIAN KOMPONEN ALAT RUBBER TYRED GANTRY DENGAN TEKNIK KEANDALAN (Studi kasus PT.EMITRACO INVESTAMA MANDIRI)

Main Author: YUSUFIL HAMDALI, AYYUP
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2009
Subjects:
Online Access: http://eprints.umm.ac.id/11756/1/PENJADWALAN_WAKTU_OPTIMAL_PENGGANTIAN_KOMPONEN_ALAT_RUBBER_TYRED_GANTRY_DENGANTEKNIK_KEANDALAN.pdf
http://eprints.umm.ac.id/11756/
ctrlnum 11756
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/11756/</relation><title>PENJADWALAN WAKTU OPTIMAL PENGGANTIAN KOMPONEN ALAT RUBBER TYRED GANTRY DENGAN TEKNIK KEANDALAN (Studi kasus : PT.EMITRACO INVESTAMA MANDIRI)</title><creator>YUSUFIL HAMDALI, AYYUP</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>PT. Emitraco Investama Mandiri be one of the company that active in service loadings at Tanjung Perak Surabaya. In the effort to accelerate service activities activity loadings, absolute need management and the tools treatment wisdom correctly and good. One of the wisdom determination moment optimal to carry out component replacement action towards the machines damage. &#xD; Aim from this watchfulness gets optimal tool component replacement time interval in tool rubber tyred gantry, and to decrease component replacement total cost. To determine optimal replacement international can use prevention replacement method (age replacement). The steps that is determine probability solid function, reliability function, rapid damage, MTTF, MTTR, count replacement cost that planned (cp), count cost every replacement time (cf) and count total cost c(tp) so that can determine optimal component replacement with total cost low replacement by using software matchad. &#xD; From data processing result is got replacement international towards component Primary Filter that is 17 days with engine reliability level as big as 0,905 so that get cost-saving as big as Rp.25.402.772,75 with c(tp) longly Rp.34.648.222,75 and c(tp) new Rp.9.245.450, - and Cable Reel 28 days with engine reliability level as big as 0,842 so that get cost-saving as big as Rp.38.406.149,58 with c(tp) longly Rp.49.834.299,58 and c(tp) new Rp.11.428.150, -.</description><date>2009</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/11756/1/PENJADWALAN_WAKTU_OPTIMAL_PENGGANTIAN_KOMPONEN_ALAT_RUBBER_TYRED_GANTRY_DENGANTEKNIK_KEANDALAN.pdf</identifier><identifier> YUSUFIL HAMDALI, AYYUP (2009) PENJADWALAN WAKTU OPTIMAL PENGGANTIAN KOMPONEN ALAT RUBBER TYRED GANTRY DENGAN TEKNIK KEANDALAN (Studi kasus : PT.EMITRACO INVESTAMA MANDIRI). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>11756</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author YUSUFIL HAMDALI, AYYUP
title PENJADWALAN WAKTU OPTIMAL PENGGANTIAN KOMPONEN ALAT RUBBER TYRED GANTRY DENGAN TEKNIK KEANDALAN (Studi kasus : PT.EMITRACO INVESTAMA MANDIRI)
title_sub PT.EMITRACO INVESTAMA MANDIRI)
publishDate 2009
topic TA Engineering (General). Civil engineering (General)
url http://eprints.umm.ac.id/11756/1/PENJADWALAN_WAKTU_OPTIMAL_PENGGANTIAN_KOMPONEN_ALAT_RUBBER_TYRED_GANTRY_DENGANTEKNIK_KEANDALAN.pdf
http://eprints.umm.ac.id/11756/
contents PT. Emitraco Investama Mandiri be one of the company that active in service loadings at Tanjung Perak Surabaya. In the effort to accelerate service activities activity loadings, absolute need management and the tools treatment wisdom correctly and good. One of the wisdom determination moment optimal to carry out component replacement action towards the machines damage. Aim from this watchfulness gets optimal tool component replacement time interval in tool rubber tyred gantry, and to decrease component replacement total cost. To determine optimal replacement international can use prevention replacement method (age replacement). The steps that is determine probability solid function, reliability function, rapid damage, MTTF, MTTR, count replacement cost that planned (cp), count cost every replacement time (cf) and count total cost c(tp) so that can determine optimal component replacement with total cost low replacement by using software matchad. From data processing result is got replacement international towards component Primary Filter that is 17 days with engine reliability level as big as 0,905 so that get cost-saving as big as Rp.25.402.772,75 with c(tp) longly Rp.34.648.222,75 and c(tp) new Rp.9.245.450, - and Cable Reel 28 days with engine reliability level as big as 0,842 so that get cost-saving as big as Rp.38.406.149,58 with c(tp) longly Rp.49.834.299,58 and c(tp) new Rp.11.428.150, -.
id IOS4109.11756
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:42:14Z
last_indexed 2017-03-21T02:42:14Z
recordtype dc
_version_ 1675924200954527744
score 17.538404