STUDI PERENCANAAN AKTIFITAS DAN SUMBER DAYA MANUSIA PADA PEMBANGUNAN INSTALASI RUANG RAWAT INAP RUMAH SAKIT Dr. SOEDONO MADIUN DENGAN METODE DIAGRAM PRESEDENCE

Main Author: HUDHA, BAHTIAR NURUL
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2006
Subjects:
Online Access: http://eprints.umm.ac.id/11486/1/STUDI_PERENCANAAN_AKTIFITAS_DAN_SUMBER_DAYA_MANUSIAPADA_PEMBANGUNAN_INSTALASI_RUANG_RAWAT_INAPRUMAH_SAKIT_Dr.pdf
http://eprints.umm.ac.id/11486/
Daftar Isi:
  • The development of increasingly faster now demanding the construction of both infrastructure and superstructure. Along with technological advances that exist today by the contractor is required to become more professional in both the planning mapun implementation of a project. To pengkoordiniran a project from planning to implementation is required mmanajemen construction field in order to better project implementation process. The implementation of a project is not out of human resources (labor). Because of human resource planning is a necessity. To avoid excess mapun shortage of human resources is very significant (HR of sharp fluctuations.) Is the program MS Project 2002 with grap resource Leveling system can assist in human resource planning. With the human resources plan and not abandon the logic of the relationship between the activity will produce a working system that efiasien. In addition, by utilizing float and lag-time in resource grap can also assist in setting and human resource activities. So the future is no longer any fluctuation of human resources is very sharp. And lemburpun process does not happen again in the future.