PENGUKURAN KINERJA DENGAN MODEL SUPPLY CHAIN OPERATION REFERENCE (SCOR)

Main Author: SANTOSO, WAHYU
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2009
Subjects:
Online Access: http://eprints.umm.ac.id/10348/1/PENGUKURAN_KINERJA_DENGAN_MODEL_SUPPLY_CHAIN_OPERATION_REFERENCE.pdf
http://eprints.umm.ac.id/10348/
ctrlnum 10348
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/10348/</relation><title>PENGUKURAN KINERJA DENGAN MODEL SUPPLY CHAIN OPERATION REFERENCE (SCOR)</title><creator>SANTOSO, WAHYU</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>PT CEMENT GERSIK have system measurement of performance by using four objective that is: Revenue Management, Cost Management, Capacity Management, Increasing Company Adventages, by 36 Key Performance Indicator ( KPI). But from 36 of KPI this there's only 1 0 KPI depicting performance process Supply Chain Pursuant to problems, hence effort first time which need to be done or &#xD; conducted by design system measurement of performance of supply company chain and do or conduct measurement in October 2008 so that or to be can be done or conducted by repair at area - area which is its performance still is ugly. During The Time PT CEMENT GERSIK have never done or conducted measurement of performance to chain-nya supply, is so that needed by measurement of performance &#xD; of supply chain. &#xD; Method to be used to identify performance indicators of supply chain is model of SCOR. Model SCOR have five dimension, that is: plan, source, make, deliver, return. SCOR also have five performance of chain supply objective, that is: reliability, responsiveness, flexibility, and cost of assets. By using method of SCOR expected can be identified by indicators of supply chain which better be used by PT CEMENT GERSIK. For the wight of performance indicator of supply chain used by method of AHP, while for the scoring of system used by method of Objective Matrix &#xD; ( OMAX). &#xD; From result of measurement of performance of supply chain in PT CEMENT GERSIK in earning 22 performance indicator of supply chain, what consist of 4 indicator for the scope of plan, 6 indicator for the scope of source, 7 indicator for the scope of make, 3 indicator for the scope of deliver and 2 indicator for the scope of return. While from result of calculation of OMAX got 1 indicator which far from company goals and need repai r action. That is KPI consume embers stone .</description><date>2009</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.umm.ac.id/10348/1/PENGUKURAN_KINERJA_DENGAN_MODEL_SUPPLY_CHAIN_OPERATION_REFERENCE.pdf</identifier><identifier> SANTOSO, WAHYU (2009) PENGUKURAN KINERJA DENGAN MODEL SUPPLY CHAIN OPERATION REFERENCE (SCOR). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>10348</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author SANTOSO, WAHYU
title PENGUKURAN KINERJA DENGAN MODEL SUPPLY CHAIN OPERATION REFERENCE (SCOR)
publishDate 2009
topic TA Engineering (General). Civil engineering (General)
url http://eprints.umm.ac.id/10348/1/PENGUKURAN_KINERJA_DENGAN_MODEL_SUPPLY_CHAIN_OPERATION_REFERENCE.pdf
http://eprints.umm.ac.id/10348/
contents PT CEMENT GERSIK have system measurement of performance by using four objective that is: Revenue Management, Cost Management, Capacity Management, Increasing Company Adventages, by 36 Key Performance Indicator ( KPI). But from 36 of KPI this there's only 1 0 KPI depicting performance process Supply Chain Pursuant to problems, hence effort first time which need to be done or conducted by design system measurement of performance of supply company chain and do or conduct measurement in October 2008 so that or to be can be done or conducted by repair at area - area which is its performance still is ugly. During The Time PT CEMENT GERSIK have never done or conducted measurement of performance to chain-nya supply, is so that needed by measurement of performance of supply chain. Method to be used to identify performance indicators of supply chain is model of SCOR. Model SCOR have five dimension, that is: plan, source, make, deliver, return. SCOR also have five performance of chain supply objective, that is: reliability, responsiveness, flexibility, and cost of assets. By using method of SCOR expected can be identified by indicators of supply chain which better be used by PT CEMENT GERSIK. For the wight of performance indicator of supply chain used by method of AHP, while for the scoring of system used by method of Objective Matrix ( OMAX). From result of measurement of performance of supply chain in PT CEMENT GERSIK in earning 22 performance indicator of supply chain, what consist of 4 indicator for the scope of plan, 6 indicator for the scope of source, 7 indicator for the scope of make, 3 indicator for the scope of deliver and 2 indicator for the scope of return. While from result of calculation of OMAX got 1 indicator which far from company goals and need repai r action. That is KPI consume embers stone .
id IOS4109.10348
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:41:46Z
last_indexed 2017-03-21T02:41:46Z
recordtype dc
_version_ 1675924193125859328
score 17.538404