ctrlnum 2927
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.sb.ipb.ac.id/2927/</relation><title>Strategi meningkatkan efektivitas pengadaan tanah bagi pelaksanaan pembangunan untuk kepentingan umum (studi kasus pengadaan tanah pembangunan jalan tol trans jawa di kabupaten subang)</title><creator>Indarto, Wing</creator><subject>Manajemen Strategi</subject><description>The purpose of this research for (a) to thoroughly problems in the implementation of the land procurement to build toll road trans java in kabupaten subang; (b) structure the main problems arising in the implementation of the land procurement to build toll road trans java in kabupaten subang; (c) formulate strategy in the implementation of the land procurement to build toll road trans java in kabupaten subang sustainable .&#xD; The study is done for 13 months (january 2013 - february 2014). The kind of data that collected primary and secondary data. Primary data is the data on obtained by observation direct and interview. Secondary data is the data collected from various sources literature study. The trait of this research is descriptive analytical. Descriptive in the sense the sense that in this research visualizing and reported in detail, systematic and thorough about anything that relating to pegadaan land for the implementation formation of memories.&#xD; The inventory results land procurement problems to build toll road trans java in kabupaten subang, there are 17 (seventeen) what problems should be solved soon, namely facilitation in the delivery of land, facilitation in dispute resolution, study amdal who have not good, mafia land, policy and government regulation relating to land and land procurement, lack of counseling the community about the importance of the construction of toll roads, the land acquisition process to toll road which still bad, the development planning discussion and society to get partner, a legal framework menururnkan action speculators, the determination of and counting the cost of project, the price of compensation that is too low, planning not transparent and accountable, preparedness of funding and readiness institutional, regional government support, the owner who takes off their land more desperate, the absence of recommendations type handling if the problem happened procurement and a legal framework for safekeeping compensation.&#xD; With using a technique permodelan interpretation structure a model (ISMA), of problems distrukturkan to 7 (seven) the main problems that must be solved fate first namely the land acquisition process, counseling to the community, the development planning discussion, preparedness of funding and institutional, policy and government regulation relating to land and land procurement, the compensation and the fate of the owner of which melapaskan land. The results of the analysis multi-dimensional uses the method mds (multi dimensional scalling, for sustainability land procurement divided into several parts or groups variable (dimensions) covered&#xD; dimensions of land acquisition, dimensions operator, dimensions licensing, dimensions the determination of and dimensions certificates .&#xD; Research shows 3 sustainability there are three dimensions (3) that supports the sustainability of land availability for construction trans java subang in the district, namely the operator, dimension and dimension the licensing .There are five (5) key must be considered in acquiring ground for construction trans java subang in the district, namely (1) land that has not receive compensation and land owned by private companies and state. (2) cooperation services marga-pemda-swasta domestic foreign. (3) financier / preparedness of funding and institutions. (4) the construction and conformity spatial plans. (5) state land.</description><date>2015</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.sb.ipb.ac.id/2927/1/9EK-01-Indarto-Cover.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.sb.ipb.ac.id/2927/2/9EK-02-Indarto-Ringkasan.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repository.sb.ipb.ac.id/2927/3/9EK-03-Indarto-Summary.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.sb.ipb.ac.id/2927/4/9EK-04-Indarto-Daftarisi.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.sb.ipb.ac.id/2927/5/9EK-05-Indarto-Pendahuluan.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repository.sb.ipb.ac.id/2927/6/Tesis%20Full.pdf</identifier><identifier> Indarto, Wing (2015) Strategi meningkatkan efektivitas pengadaan tanah bagi pelaksanaan pembangunan untuk kepentingan umum (studi kasus pengadaan tanah pembangunan jalan tol trans jawa di kabupaten subang). Masters thesis, Institut Pertanian Bogor. </identifier><relation>http://lib.sb.ipb.ac.id/</relation><recordID>2927</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Indarto, Wing
title Strategi meningkatkan efektivitas pengadaan tanah bagi pelaksanaan pembangunan untuk kepentingan umum (studi kasus pengadaan tanah pembangunan jalan tol trans jawa di kabupaten subang)
publishDate 2015
topic Manajemen Strategi
url http://repository.sb.ipb.ac.id/2927/1/9EK-01-Indarto-Cover.pdf
http://repository.sb.ipb.ac.id/2927/2/9EK-02-Indarto-Ringkasan.pdf
http://repository.sb.ipb.ac.id/2927/3/9EK-03-Indarto-Summary.pdf
http://repository.sb.ipb.ac.id/2927/4/9EK-04-Indarto-Daftarisi.pdf
http://repository.sb.ipb.ac.id/2927/5/9EK-05-Indarto-Pendahuluan.pdf
http://repository.sb.ipb.ac.id/2927/6/Tesis%20Full.pdf
http://repository.sb.ipb.ac.id/2927/
http://lib.sb.ipb.ac.id/
contents The purpose of this research for (a) to thoroughly problems in the implementation of the land procurement to build toll road trans java in kabupaten subang; (b) structure the main problems arising in the implementation of the land procurement to build toll road trans java in kabupaten subang; (c) formulate strategy in the implementation of the land procurement to build toll road trans java in kabupaten subang sustainable . The study is done for 13 months (january 2013 - february 2014). The kind of data that collected primary and secondary data. Primary data is the data on obtained by observation direct and interview. Secondary data is the data collected from various sources literature study. The trait of this research is descriptive analytical. Descriptive in the sense the sense that in this research visualizing and reported in detail, systematic and thorough about anything that relating to pegadaan land for the implementation formation of memories. The inventory results land procurement problems to build toll road trans java in kabupaten subang, there are 17 (seventeen) what problems should be solved soon, namely facilitation in the delivery of land, facilitation in dispute resolution, study amdal who have not good, mafia land, policy and government regulation relating to land and land procurement, lack of counseling the community about the importance of the construction of toll roads, the land acquisition process to toll road which still bad, the development planning discussion and society to get partner, a legal framework menururnkan action speculators, the determination of and counting the cost of project, the price of compensation that is too low, planning not transparent and accountable, preparedness of funding and readiness institutional, regional government support, the owner who takes off their land more desperate, the absence of recommendations type handling if the problem happened procurement and a legal framework for safekeeping compensation. With using a technique permodelan interpretation structure a model (ISMA), of problems distrukturkan to 7 (seven) the main problems that must be solved fate first namely the land acquisition process, counseling to the community, the development planning discussion, preparedness of funding and institutional, policy and government regulation relating to land and land procurement, the compensation and the fate of the owner of which melapaskan land. The results of the analysis multi-dimensional uses the method mds (multi dimensional scalling, for sustainability land procurement divided into several parts or groups variable (dimensions) covered dimensions of land acquisition, dimensions operator, dimensions licensing, dimensions the determination of and dimensions certificates . Research shows 3 sustainability there are three dimensions (3) that supports the sustainability of land availability for construction trans java subang in the district, namely the operator, dimension and dimension the licensing .There are five (5) key must be considered in acquiring ground for construction trans java subang in the district, namely (1) land that has not receive compensation and land owned by private companies and state. (2) cooperation services marga-pemda-swasta domestic foreign. (3) financier / preparedness of funding and institutions. (4) the construction and conformity spatial plans. (5) state land.
id IOS3669.2927
institution Institut Pertanian Bogor
institution_id 20
institution_type library:university
library
library Perpustakaan Sekolah Bisnis
library_id 692
collection Repositori Sekolah Bisnis IPB
repository_id 3669
subject_area Business/Bisnis
Marketing, Management of Distribution/Marketing, Manajemen Distribusi
city BOGOR
province JAWA BARAT
repoId IOS3669
first_indexed 2018-02-20T00:22:05Z
last_indexed 2018-02-20T00:22:05Z
recordtype dc
_version_ 1763211600554098688
score 17.538404