STUDI POTENSI LAHAN DAN AREA PERUMAHAN UNTUK IMPLEMENTASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DI WILAYAH SERANG DAN CILEGON BANTEN
Main Authors: | Suhendar, Suhendar, Raharjo, Budi, Alimuddin, Alimuddin, Sutjipto, Hady |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | ind |
Terbitan: |
Jurusan teknik elektro Universitas Bangka Belitung
, 2016
|
Subjects: | |
Online Access: |
https://eprints.untirta.ac.id/15555/1/1.%20STUDI%20POTENSI%20LAHAN%208%25.pdf https://eprints.untirta.ac.id/15555/2/1.%20Studi%20Potensi%20Lahan.pdf https://eprints.untirta.ac.id/15555/3/GABUNGAB%20PENILAIAN%20FORM%20PEER%20REVIEWER%20JURNAL%20ECOTIPE%20Prof.%20%20Syafruddin%20-Prof%20Syamsir.pdf https://eprints.untirta.ac.id/15555/ |
Daftar Isi:
- Electrical energy requirements increase as population growth and technological development. Increased triggered also by the rate of energy demand growth of 6.86% annually. Energy needs largely derived from non-renewable energy which has its limitations and is not environmentally friendly. Therefore we need a renewable energy alternative and environmentally friendly. One such alternative is the use of solar energy as a power plant that was converted by solar panels. To do with it, this study aims to determine the potential for, contributions and aspects of the cost of solar energy as a power plant in a residential neighborhood Serang Cilegon. The results showed that the development and implementation of SPP in an open area can generate a total capacity 84971.481 kWp. The greatest potential in the residential Highland Park with a capacity of 50370.802 kWp that have an energy conversion amounted to 36,707,706 kWh / year. While the supply of energy 33750047 kWh / year will be able to contribute to meet all the needs of the household burden. While in Pondok Cilegon Indah residential area with a capacity of 123.032 kWp with a conversion of energy 98387 kWh / year. Energy supply 90 452 kWh / year to contribute 0.76% of the burden of households. PLTS investment with life project for 25 years for a return on investment costs takes as long as 25 years and 1 month as of the beginning of the project so as not feasible investment. Keywords : Banten, Cilegon, Hydroelectric, Potential, Serang, Solar Energy, Solar Panels,