BIAYA DAN PRODUKTIVITAS TREE LENGTH LOGGING DI HUTAN ALAM PRODUKSI

Main Authors: Idris, Maman Mansyur, Sukanda, Sukanda
Other Authors: Pusat Litbang Keteknikan Kehutanan dan Pengolahan Hasil Hutan
Format: Article info eJournal
Bahasa: ind
Terbitan: Pusat Penelitian dan Pengembangan Hasil Hutan , 2012
Subjects:
Online Access: http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631/613
ctrlnum --ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-631
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">BIAYA DAN PRODUKTIVITAS TREE LENGTH LOGGING DI HUTAN ALAM PRODUKSI</title><creator>Idris, Maman Mansyur</creator><creator>Sukanda, Sukanda</creator><subject lang="id-ID">Skidding, cost, productivity, tree length logging</subject><description lang="id-ID">This study examined cost and productivity of tree length logging system in natural production forest. The study was conducted in several forest concession in Kalimantan. The results showed that the sytem is capable to extract the clearbole part as main production log and the wasted log above the first branch into the landing point. Skidding productivityof tree length syistem in PT Gunung Gajah Abadi 6,25 m3/jam/hm, PT Narkata Rimba 15,54 m3/hr/hm, PT Balikpapan Forest Industries 16,67 m3/hr/hm, PT Jatitrin Co Ltd 20,76 m3/hr/hm, PT Dwima Jaya Utama 36,69 m3/hr/hm dan PT Kayu Tribuana Rama 21,67 m3/hr/hm.The average cost of tree length logging system in PT Gunung Gajah Abadi is Rp 84.817,92 / m3, PT Narkata Rimba Rp 33.636,55/ m3, PT Balikpapan Forest Industries Rp 31.800,34/ m3, PT Jatitrin Co Ltd Rp. 25.535,26/ m3, PT Dmimajaya Utama Rp 14.155,19/ m3 and PT Kayu Tribuana Rama Rp. 25.207,41/ m3.</description><publisher lang="id-ID">Pusat Penelitian dan Pengembangan Hasil Hutan</publisher><contributor lang="id-ID">Pusat Litbang Keteknikan Kehutanan dan Pengolahan Hasil Hutan</contributor><date>2012-12-01</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>Other:</type><type>Other:</type><identifier>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631</identifier><identifier>10.20886/jphh.2012.30.4.269-278</identifier><source lang="en-US">Jurnal Penelitian Hasil Hutan; Vol 30, No 4 (2012): ; 269-278</source><source lang="id-ID">Jurnal Penelitian Hasil Hutan; Vol 30, No 4 (2012): ; 269-278</source><source>2442-8957</source><source>0216-4329</source><language>ind</language><relation>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631/613</relation><rights lang="en-US">Copyright (c) 2015 Jurnal Penelitian Hasil Hutan</rights><recordID>--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-631</recordID></dc>
language ind
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
Other:
Journal:eJournal
author Idris, Maman Mansyur
Sukanda, Sukanda
author2 Pusat Litbang Keteknikan Kehutanan dan Pengolahan Hasil Hutan
title BIAYA DAN PRODUKTIVITAS TREE LENGTH LOGGING DI HUTAN ALAM PRODUKSI
publisher Pusat Penelitian dan Pengembangan Hasil Hutan
publishDate 2012
topic Skidding
cost
productivity
tree length logging
url http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/631/613
contents This study examined cost and productivity of tree length logging system in natural production forest. The study was conducted in several forest concession in Kalimantan. The results showed that the sytem is capable to extract the clearbole part as main production log and the wasted log above the first branch into the landing point. Skidding productivityof tree length syistem in PT Gunung Gajah Abadi 6,25 m3/jam/hm, PT Narkata Rimba 15,54 m3/hr/hm, PT Balikpapan Forest Industries 16,67 m3/hr/hm, PT Jatitrin Co Ltd 20,76 m3/hr/hm, PT Dwima Jaya Utama 36,69 m3/hr/hm dan PT Kayu Tribuana Rama 21,67 m3/hr/hm.The average cost of tree length logging system in PT Gunung Gajah Abadi is Rp 84.817,92 / m3, PT Narkata Rimba Rp 33.636,55/ m3, PT Balikpapan Forest Industries Rp 31.800,34/ m3, PT Jatitrin Co Ltd Rp. 25.535,26/ m3, PT Dmimajaya Utama Rp 14.155,19/ m3 and PT Kayu Tribuana Rama Rp. 25.207,41/ m3.
id IOS3429.--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-631
institution Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia
institution_id 475
institution_type library:special
library
library Perpustakaan Kementerian Lingkungan Hidup dan Kehutanan RI
library_id 121
collection Indonesian Journal of Forestry Research
repository_id 3429
subject_area Kehutanan
Lingkungan
Pertanian
city BOGOR
province JAWA BARAT
repoId IOS3429
first_indexed 2016-09-28T01:15:10Z
last_indexed 2016-09-28T01:15:10Z
recordtype dc
merged_child_boolean 1
_version_ 1800763723179098112
score 17.13294