PRODUKTIVITAS DAN BIAYA PENYARADAN KAYU DENGAN KERBAU DI JAMBI
Main Authors: | Dulsalam, Dulsalam, Sukadaryati, Sukadaryati |
---|---|
Other Authors: | pusat litbang hasil hutan |
Format: | Article info application/pdf eJournal |
Bahasa: | ind |
Terbitan: |
Pusat Penelitian dan Pengembangan Hasil Hutan
, 2017
|
Online Access: |
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839 http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839/3319 |
ctrlnum |
--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3839 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">PRODUKTIVITAS DAN BIAYA PENYARADAN KAYU DENGAN KERBAU DI JAMBI</title><creator>Dulsalam, Dulsalam</creator><creator>Sukadaryati, Sukadaryati</creator><subject lang="id-ID"/><description lang="id-ID">An investigation on productivity and log­skidding cost using buffalo (Bubalus bubalis) was carried out at the area of lnhutani V in Jambi in 1999. The objective is to get reliable information about such productivity and cost. Connected with this purpose, some related data as collected were i.e. volume of skidded log, skidding distance, skidding­working time, buffalo working time, feeding cost, operator cost, and equipment.Volumes of log which was skidded using buffalo ranged between 0.094 and 0.904 m3/tripwith an avverage of 0.484 m3/trip. Skidding distance using buffalo varied from 10 to 2­12 m with an average of 82 m. The working time varied from 11 to 83 minutes with an average of 30 minutes. The log skidding productivity ranged between 0.035 and 1.211 m3­hm/hour with an average of 0.338 m3­hmlhour. Log skidding costs using buffalo ranged between Rp 681 and Rp23.589 m3­hm with an average of Rp 4.375/m3­hm. It is suggested that volume of skidded log in each round trip and skidding distance be not more than 1 m3 and 250 m, respectively.</description><publisher lang="id-ID">Pusat Penelitian dan Pengembangan Hasil Hutan</publisher><contributor lang="id-ID">pusat litbang hasil hutan</contributor><date>2017-08-28</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>Other:</type><type>File:application/pdf</type><identifier>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839</identifier><identifier>10.20886/jphh.2001.19.3.147-164</identifier><source lang="en-US">Journal of Forest Products Research; Vol 19, No 3 (2001): Buletin Penelitian Hasil Hutan; 147-164</source><source lang="id-ID">Jurnal Penelitian Hasil Hutan; Vol 19, No 3 (2001): Buletin Penelitian Hasil Hutan; 147-164</source><source>2442-8957</source><source>0216-4329</source><language>ind</language><relation>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839/3319</relation><rights lang="en-US">Copyright (c) 2017 Jurnal Penelitian Hasil Hutan</rights><rights lang="en-US">http://creativecommons.org/licenses/by-nc-sa/4.0</rights><recordID>--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3839</recordID></dc>
|
language |
ind |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other Other: File:application/pdf File Journal:eJournal |
author |
Dulsalam, Dulsalam Sukadaryati, Sukadaryati |
author2 |
pusat litbang hasil hutan |
title |
PRODUKTIVITAS DAN BIAYA PENYARADAN KAYU DENGAN KERBAU DI JAMBI |
publisher |
Pusat Penelitian dan Pengembangan Hasil Hutan |
publishDate |
2017 |
url |
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839 http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3839/3319 |
contents |
An investigation on productivity and logskidding cost using buffalo (Bubalus bubalis) was carried out at the area of lnhutani V in Jambi in 1999. The objective is to get reliable information about such productivity and cost. Connected with this purpose, some related data as collected were i.e. volume of skidded log, skidding distance, skiddingworking time, buffalo working time, feeding cost, operator cost, and equipment.Volumes of log which was skidded using buffalo ranged between 0.094 and 0.904 m3/tripwith an avverage of 0.484 m3/trip. Skidding distance using buffalo varied from 10 to 212 m with an average of 82 m. The working time varied from 11 to 83 minutes with an average of 30 minutes. The log skidding productivity ranged between 0.035 and 1.211 m3hm/hour with an average of 0.338 m3hmlhour. Log skidding costs using buffalo ranged between Rp 681 and Rp23.589 m3hm with an average of Rp 4.375/m3hm. It is suggested that volume of skidded log in each round trip and skidding distance be not more than 1 m3 and 250 m, respectively. |
id |
IOS3429.--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3839 |
institution |
Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia |
institution_id |
475 |
institution_type |
library:special library |
library |
Perpustakaan Kementerian Lingkungan Hidup dan Kehutanan RI |
library_id |
121 |
collection |
Indonesian Journal of Forestry Research |
repository_id |
3429 |
subject_area |
Kehutanan Lingkungan Pertanian |
city |
BOGOR |
province |
JAWA BARAT |
repoId |
IOS3429 |
first_indexed |
2017-09-10T00:57:12Z |
last_indexed |
2017-09-10T00:57:12Z |
recordtype |
dc |
merged_child_boolean |
1 |
_version_ |
1800763738225115136 |
score |
17.13294 |