ANALISIS BIAYA DAN TENAGA KERJA PADA BEBERAPA KILANG PENGGERGAJIAN DI SUMATERA SELATAN
Main Authors: | Sylviani, Sylviani, Abdurachman, Akub J |
---|---|
Other Authors: | Pusat Litbang Hasil Hutan |
Format: | Article info application/pdf eJournal |
Bahasa: | ind |
Terbitan: |
Pusat Penelitian dan Pengembangan Hasil Hutan
, 2017
|
Online Access: |
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466 http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466/3001 |
ctrlnum |
--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3466 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">ANALISIS BIAYA DAN TENAGA KERJA PADA BEBERAPA KILANG PENGGERGAJIAN DI SUMATERA SELATAN</title><creator>Sylviani, Sylviani</creator><creator>Abdurachman, Akub J</creator><subject lang="id-ID"/><description lang="id-ID">The result of research on several sawmills in South Sumatera  showed that average   level of manager productivity is 7.563 Cu.m/man/annum, administration productivity is  3.220 Cu.m/man/annum, tecnician productivity is 74 Cu.m/man/annum. Average labor   requirements are 9 men/1.000 Cu.m  of  the  design  capacity  and  10  men/1.000 Cu.m  of  raw material.Cost of  production of  sawntimber   showed  an average  of  Rp  184.808,-/Cu.m, in which  the processing  cost  alone ranked  high  up  to an average of  83 %, marketing  cost 10 %,  and general cost  7 %. Profit  generated of  each  mill per annum  ranged from  Rp 891.060.692,- to Rp  3.165.279.700,- or equivalent   to an average  of  Rp  80.053  per  Cu.m.</description><publisher lang="id-ID">Pusat Penelitian dan Pengembangan Hasil Hutan</publisher><contributor lang="id-ID">Pusat Litbang Hasil Hutan</contributor><date>2017-08-21</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>Other:</type><type>File:application/pdf</type><identifier>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466</identifier><identifier>10.20886/jphh.1990.7.4.150 - 155</identifier><source lang="en-US">Journal of Forest Products Research; Vol 7, No 4 (1990): Jurnal Penelitian Hasil Hutan; 150-155</source><source lang="id-ID">Jurnal Penelitian Hasil Hutan; Vol 7, No 4 (1990): Jurnal Penelitian Hasil Hutan; 150-155</source><source>2442-8957</source><source>0216-4329</source><language>ind</language><relation>http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466/3001</relation><rights lang="en-US">Copyright (c) 2017 Jurnal Penelitian Hasil Hutan</rights><rights lang="en-US">http://creativecommons.org/licenses/by-nc-sa/4.0</rights><recordID>--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3466</recordID></dc>
|
language |
ind |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other Other: File:application/pdf File Journal:eJournal |
author |
Sylviani, Sylviani Abdurachman, Akub J |
author2 |
Pusat Litbang Hasil Hutan |
title |
ANALISIS BIAYA DAN TENAGA KERJA PADA BEBERAPA KILANG PENGGERGAJIAN DI SUMATERA SELATAN |
publisher |
Pusat Penelitian dan Pengembangan Hasil Hutan |
publishDate |
2017 |
url |
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466 http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3466/3001 |
contents |
The result of research on several sawmills in South Sumatera showed that average level of manager productivity is 7.563 Cu.m/man/annum, administration productivity is 3.220 Cu.m/man/annum, tecnician productivity is 74 Cu.m/man/annum. Average labor requirements are 9 men/1.000 Cu.m of the design capacity and 10 men/1.000 Cu.m of raw material.Cost of production of sawntimber showed an average of Rp 184.808,-/Cu.m, in which the processing cost alone ranked high up to an average of 83 %, marketing cost 10 %, and general cost 7 %. Profit generated of each mill per annum ranged from Rp 891.060.692,- to Rp 3.165.279.700,- or equivalent to an average of Rp 80.053 per Cu.m. |
id |
IOS3429.--ejournal.forda-mof.org-ejournal-litbang-index.php-index-oai:article-3466 |
institution |
Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia |
institution_id |
475 |
institution_type |
library:special library |
library |
Perpustakaan Kementerian Lingkungan Hidup dan Kehutanan RI |
library_id |
121 |
collection |
Indonesian Journal of Forestry Research |
repository_id |
3429 |
subject_area |
Kehutanan Lingkungan Pertanian |
city |
BOGOR |
province |
JAWA BARAT |
repoId |
IOS3429 |
first_indexed |
2017-09-10T00:57:42Z |
last_indexed |
2017-09-10T00:57:42Z |
recordtype |
dc |
merged_child_boolean |
1 |
_version_ |
1800763730910248960 |
score |
17.13294 |