EVALUATION TO PRODUCTION PERFORMANCE CONSIDERING DEPARTMENTS DISTANCE AND ROUTE TIME USING SIMULATION WITH ARENA
Main Author: | Yogi Yogaswara, DS |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
ISIEM
, 2012
|
Subjects: | |
Online Access: |
http://repository.unpas.ac.id/3727/1/A3%20ISIEM%202012%20Evaluation.pdf http://repository.unpas.ac.id/3727/ http://teknik.unpas.ac.id |
Daftar Isi:
- This study is about the application of a simulation model to assist performance evaluation of production considering departments distance and route time by using empirical data on a shoe-making industry. The existing condition is composed of 3 main parts which are processed into 9 departments of production. Departments 1st – 5th are a fabrication process, Departments 6th – 7th are the assembling process 1st and 2nd, Department 8th is the process of packing, and the department 9th is the inspection/Quality Control process. The three components through different fabrication processes, and the time between arrival meet to exponential distribution with an average of 13 minutes. Percentage of arrival for each component was 26% for parts A, 48% for part B, and 26% for part C. Key words: simulation, departments distance, route time.