Model Integrasi Penjadwalan Batch.... (Zahedi) 397 MODEL INTEGRASI PENJADWALAN BATCH DAN PENJADWALAN PREVENTIVE MAINTENANCE DENG AN KRITERIA MINIMISASI BIAYA SIMPAN, BIAYA SETUP, BIAYA PM, SERTA BIAYA REWORK PADA MESIN STABIL
Main Author: | Zahedi, Zahedi |
---|---|
Format: | Article PeerReviewed |
Terbitan: |
Binus University
, 2014
|
Online Access: |
http://eprints.binus.ac.id/31048/ http://library.binus.ac.id/Collections/journal_detail.aspx?subject=25&volnoed=Volume 05 / Nomor 01 / June 2014&title=Model Integrasi Penjadwalan Batch.... (Zahedi) 397 MODEL INTEGRASI PENJADWALAN BATCH DAN PENJADWALAN PREVENTIVE MAINTENANCE DENG AN KRITER |
Internet
http://eprints.binus.ac.id/31048/http://library.binus.ac.id/Collections/journal_detail.aspx?subject=25&volnoed=Volume 05 / Nomor 01 / June 2014&title=Model Integrasi Penjadwalan Batch.... (Zahedi) 397 MODEL INTEGRASI PENJADWALAN BATCH DAN PENJADWALAN PREVENTIVE MAINTENANCE DENG AN KRITER
Lokasi
Koleksi | Binus University e-Thesis Repository |
---|---|
Gedung | Binus University Library and Knowledge Center |
Institusi | Universitas Bina Nusantara |
Kota | JAKARTA BARAT |
Provinsi | DKI JAKARTA |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |