Model Integrasi Penjadwalan Batch.... (Zahedi) 397 MODEL INTEGRASI PENJADWALAN BATCH DAN PENJADWALAN PREVENTIVE MAINTENANCE DENG AN KRITERIA MINIMISASI BIAYA SIMPAN, BIAYA SETUP, BIAYA PM, SERTA BIAYA REWORK PADA MESIN STABIL
Main Author: | Zahedi, Zahedi |
---|---|
Format: | Article PeerReviewed |
Terbitan: |
Binus University
, 2014
|
Online Access: |
http://eprints.binus.ac.id/31048/ http://library.binus.ac.id/Collections/journal_detail.aspx?subject=25&volnoed=Volume 05 / Nomor 01 / June 2014&title=Model Integrasi Penjadwalan Batch.... (Zahedi) 397 MODEL INTEGRASI PENJADWALAN BATCH DAN PENJADWALAN PREVENTIVE MAINTENANCE DENG AN KRITER |
Daftar Isi:
- This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the un availability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance