ANALISIS DAN PERANCANGAN SISTEM INFORMASI PENERAPAN PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN RELIABILITY KOMPONEN KRITIS MESIN BAN BURRY MIXER DAN MINIMASI TOTAL COST PADA PT. GAJAH TUNGGAL, TBK
Main Author: | ARIEF, WILLIAM |
---|---|
Format: | Thesis NonPeerReviewed pdf |
Bahasa: | eng |
Terbitan: |
, 2008
|
Subjects: | |
Online Access: |
http://eprints.binus.ac.id/2428/1/2008-1-00448-TISI-Abstrak.pdf http://eprints.binus.ac.id/2428/ http://library.binus.ac.id/Collections/ethesis_detail.aspx?ethesisid=2008-1-00448-TISI |