ANALISIS PANAS HIDRASI PADA FONDASI BORED PILE DI LAUT MENGGUNAKAN SOFTWARE MIDAS PADA PROYEK JEMBATAN SURAMADU
Main Authors: | Made, Suangga, Ardiaz, Kamil Nuryadin |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
Binus University
, 2007
|
Subjects: | |
Online Access: |
http://eprints.binus.ac.id/13312/1/04_Partisi%20vol.4%20no.2-ABSTRACT.pdf http://eprints.binus.ac.id/13312/ |
Daftar Isi:
- Article analyzes the difference between outside and inside temperature on Suramadu bored pile foundation, the tension, and find out whether there is a crack on the foundation concrete or not. Based on the research result, it is concluded that maximum and minimum temperature happens on 80 hours hydration process after a foundry with maximum temperature 43,94°C and minimum 20°C; so the temperature difference on the bored pile foundation is 23,94°C. From the temperature difference, the maximum tension value is 0, 56 N/mm2 and allowed tension is 2,27 N/mm2. So, it is generaly stated that Suramadu bored pile foundation is saved from cracking because the value of maximum tension is lower than allowed concrete tension.