PENERAPAN SISTEM PERENCANAAN KEBUTUHAN KOMPONEN UNTUK MEMENUHI KEBUTUHAN HUB TIPE SUPRA PADA PT ASTRA HONDA MOTOR

Main Author: Arifin, Yusuf; Binus University
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Industrial and Systems Engineering Assessment Journal (INASEA)
Online Access: http://journal.binus.ac.id/index.php/inasea/article/view/218
http://journal.binus.ac.id/index.php/inasea/article/view/218/214
Daftar Isi:
  • Planning system of customer needs in Astra Honda Motor Company using Material Requirement Planning system with order applying several metods, for example Lot for Lot, POQ, and EOQ. The disadvantages of those applied system is not knowing which method is the most advantages. Therefore, a research on how to compare the having cost for each method is needed. The result, Lot For Lot (LFL) method is the method minimal cost