PERENCANAAN DAN PENJADWALAN DISTRIBUSI DENGAN METODE DISTRIBUTION REQUIREMENT PLANNING DI CV. FAJAR TEKNIK SEJAHTERA, SIDOARJO
Main Author: | ADIK ALFAN , ARIANDI |
---|---|
Format: | Thesis NonPeerReviewed application/pdf |
Terbitan: |
, 2012
|
Subjects: | |
Online Access: |
http://eprints.upnjatim.ac.id/3774/1/file1.pdf http://eprints.upnjatim.ac.id/3774/2/file2.pdf http://eprints.upnjatim.ac.id/3774/ |
Daftar Isi:
- A lot of companies are faced with the problems associated the distribution system. The problem arises because consumers are at geographically separate locations, this has resulted in the need to store inventory at multiple locations so as to cause problems in coordinating the management of the distribution system marketing, as well as on the production that will produce the best products. It required a good distribution system and supply products appropriate to the level of customer satisfaction and corporate profits can awake. CV. Dawn Prosperous Engineering is a manufacturing company engaged in the field of industrial coatings Roll Conveyor and Rubber Packing, distribution the company is based at the request of the customer. Inside This company has not found the existence of a planning and scheduling product distribution activities are well coordinated, so the demand for each type of product resulting in less controlled delays in product distribution. Given these problems, it carried out the planning and distribution scheduling methods Distribution Requirements Planning (DRP). It is expected that the planning and scheduling of distribution activities well, success in meeting customer demand will become more optimal, improved sales performance in fulfilling orders in a timely manner and the right amount so that distribution costs can be minimized. The results of the research showed that scheduling activities for the distribution Roll Conveyor products in March 2012 as the delivery to Pasuruan 140 units, Malang as many as 119 units, as many as 131 units Mojokerto, Jombang as many as 136 units and as many as 142 units Kediri. For products Rubber Packing In March 2012 the delivery to as many as 218 units Pasuruan, Malang as many as 246 units, as many as 235 units Mojokerto, Jombang many as 241 units, and Kediri many as 254 units. Cost distribution by the method of the company in 2011 amounting to Rp. 49,798,900, - while the cost of distribution by the method of Distribution Requirements Planning (DRP) in 2011 amounted to Rp. 45,519,050, -. Then obtained savings of Rp. 4,279,850, - or 8.59% per year.