PENINGKATAN AVAILABILITY BASE TRANCEIVER STATION (BTS) DENGAN OPTIMASI SITE CREW MENGGUNAKAN LIFE CYLE COST (LCC) DAN USULAN STRATEGI PERAWATAN DENGAN METODE REALIBILITY CENTERED MAINTENANCE (RCM) (Studi Kasus PT. Telkomsel Jakarta Selatan)

Main Author: SIHOL MARIANA SEPTINA
Format: Bachelors
Terbitan: Universitas Telkom, S1 Teknik Industri , 2008
Subjects:
Online Access: https://openlibrary.telkomuniversity.ac.id/pustaka/132406/peningkatan-availability-base-tranceiver-station-bts-dengan-optimasi-site-crew-menggunakan-life-cyle-cost-lcc-dan-usulan-strategi-perawatan-dengan-metode-realibility-centered-maintenance-rcm-studi-kasus-pt-telkomsel-jakarta-selatan-.html