STUDI POTENSI PLTMH JALUR DISTRIBUSI AIR PDAM KOTA MALANG DAN RANCANG BANGUN ELECTRIC LOAD CONTROL (ELC) BERBASIS FUZZY LOGIC CONTROLLER
Main Authors: | , Weldan Kusuf, , Dr.-Ing.Ir. Agus Maryono |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
[Yogyakarta] : Universitas Gadjah Mada
, 2011
|
Subjects: | |
Online Access: |
https://repository.ugm.ac.id/91034/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52509 |
Daftar Isi:
- Green energy as an alternative sources for renewable energy such as solar power, wind power and hydroelectric power, worthy to be developed in Indonesia. Terminology of hydropower system, the introduction of the term micro-hydro power plant (MHP), that is power plant which has a production capacity below 100 KW electricity. Research and study took place in PDAM Kota Malang, East Java, Indonesia has purposed for maping the potential distribution channels and Water Release Chamber (BPT) PDAM Kota Malan. Related with the research, the location of BPT were used as the location of the MHP with electric potential awakened around 10kW. On this research, created a tool for optimizing the ELC Ballast Load-based fuzzy logic controller (FLC) on the MHP system. By implementing the fuzzy algorithm parameters are voltage references, errors and the delta_errors, it were computed and calculated to generate control signals through ATMEGA microcontroller16. The test results on the field-site with 3kW generator, lights and heater load, it yielded about 1400W and using ELC-fuzzy gain performance improvement 12.56% and the power stability of the voltage range 190-230 VAC. The most optimum power and voltage stability could has reached from 80-980 Watts.