PEMBUATAN PERANGKAT LUNAK MODEL SIMULASI PENGOPERASIAN WADUK WONOGIRI UNTUK PENGENDALIAN BANJIR DI WILAYAH SUNGAI BENGAWAN SOLO HULU

Main Authors: , ADIB FARIKHA, , Dr. Ir. Rachmad Jayadi, M.Eng.
Format: Thesis NonPeerReviewed
Terbitan: [Yogyakarta] : Universitas Gadjah Mada , 2014
Subjects:
ETD
Online Access: https://repository.ugm.ac.id/133057/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73608
ctrlnum 133057
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>https://repository.ugm.ac.id/133057/</relation><title>PEMBUATAN PERANGKAT LUNAK MODEL SIMULASI PENGOPERASIAN WADUK WONOGIRI UNTUK PENGENDALIAN BANJIR DI WILAYAH SUNGAI BENGAWAN SOLO HULU</title><creator>, ADIB FARIKHA</creator><creator>, Dr. Ir. Rachmad Jayadi, M.Eng.</creator><subject>ETD</subject><description>Wonogiri reservoir has water catchment areas (DTA) as many as 10 watershed (DAS), with Keduang DAS is the largest watershed of DTA of Wonogiri Reservoir.Keduang DAS channels large sedimentary so that affect on the reduction of the volume of the reservoir catchment. To solve the sedimentation problem, it has been built a new spillway and closure dike that separates the reservoir catchment into two parts, the Main Reservoir (MR) and Sediment Storage Reservoir (SSR). Previously it has been done a research about the development of the hydrologic-hydraulic software using visual basic software for flood control, but not in accordance with the current conditions. Therefore, it needs to make the development of new software in accordance with the circumstances that exist at of Wonogiri Reservoir. Software of Wonogiri Reservoir simulation operation model for flood control in the area of the Solo River was created using Microsoft Visual Studio software and Microsoft Access. This software simulating reservoir flood routing calculations to obtain the appropriate spillway operation pattern so that the reservoir in a safe condition. That operation pattern are spillway recommendations which will operate (only new spillway or old spillway will operate too) along the door aperture height. The result of the software development gives realtime monitoring information on the reservoir. That monitoring data in the form of</description><publisher>[Yogyakarta] : Universitas Gadjah Mada</publisher><date>2014</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><identifier> , ADIB FARIKHA and , Dr. Ir. Rachmad Jayadi, M.Eng. (2014) PEMBUATAN PERANGKAT LUNAK MODEL SIMULASI PENGOPERASIAN WADUK WONOGIRI UNTUK PENGENDALIAN BANJIR DI WILAYAH SUNGAI BENGAWAN SOLO HULU. UNSPECIFIED thesis, UNSPECIFIED. </identifier><relation>http://etd.ugm.ac.id/index.php?mod=penelitian_detail&amp;sub=PenelitianDetail&amp;act=view&amp;typ=html&amp;buku_id=73608</relation><recordID>133057</recordID></dc>
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
author , ADIB FARIKHA
, Dr. Ir. Rachmad Jayadi, M.Eng.
title PEMBUATAN PERANGKAT LUNAK MODEL SIMULASI PENGOPERASIAN WADUK WONOGIRI UNTUK PENGENDALIAN BANJIR DI WILAYAH SUNGAI BENGAWAN SOLO HULU
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
topic ETD
url https://repository.ugm.ac.id/133057/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73608
contents Wonogiri reservoir has water catchment areas (DTA) as many as 10 watershed (DAS), with Keduang DAS is the largest watershed of DTA of Wonogiri Reservoir.Keduang DAS channels large sedimentary so that affect on the reduction of the volume of the reservoir catchment. To solve the sedimentation problem, it has been built a new spillway and closure dike that separates the reservoir catchment into two parts, the Main Reservoir (MR) and Sediment Storage Reservoir (SSR). Previously it has been done a research about the development of the hydrologic-hydraulic software using visual basic software for flood control, but not in accordance with the current conditions. Therefore, it needs to make the development of new software in accordance with the circumstances that exist at of Wonogiri Reservoir. Software of Wonogiri Reservoir simulation operation model for flood control in the area of the Solo River was created using Microsoft Visual Studio software and Microsoft Access. This software simulating reservoir flood routing calculations to obtain the appropriate spillway operation pattern so that the reservoir in a safe condition. That operation pattern are spillway recommendations which will operate (only new spillway or old spillway will operate too) along the door aperture height. The result of the software development gives realtime monitoring information on the reservoir. That monitoring data in the form of
id IOS2744.133057
institution Universitas Gadjah Mada
institution_id 19
institution_type library:university
library
library Perpustakaan Pusat Universitas Gadjah Mada
library_id 488
collection UGM Repository
repository_id 2744
subject_area Karya Umum
city SLEMAN
province DAERAH ISTIMEWA YOGYAKARTA
repoId IOS2744
first_indexed 2016-09-14T18:34:38Z
last_indexed 2016-09-22T21:48:46Z
recordtype dc
_version_ 1765816556169723904
score 17.538404