METODE PELAKSANAAN STRUKTUR ATAS JEMBATAN BRANTAS
Main Authors: | , DIAN PRASETIYOWATI, , Lava Himawan, S.T., M.T, |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
[Yogyakarta] : Universitas Gadjah Mada
, 2014
|
Subjects: | |
Online Access: |
https://repository.ugm.ac.id/132619/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73158 |
Daftar Isi:
- The bridge is one of the Brantas project Kertosono-Mojokerto toll road, which is located in Mojokerto East Java. The purpose of the construction this bridge is to connect the Jombang regency with Mojokerto regency. Long bridge structure above the river with a strong flow, then used a balanced cantilever method of construction system that process from each side of both segmental and meet in the middle of the span. The construction for each of its box girder segment requires tools called traveler. In addition to using the traveler, the construction this bridge or pedestal using temporary shoring during the construction of hammerhead. Construction of the traveler is very beneficial because it used two traveler on each pier to speed up the implementation, the contruction process should be continued even in heavy river flows while contruction activity did not disturb the traffic under the bridge.