PELAKSANAAN DAN ANALISA PRODUKTIVITAS ALAT BERAT DALAM PENGECORAN ELEMEN STRUKTUR (KOLOM, BALOK, DAN PLAT)

Main Authors: , ANDHIKA WIGUNA, , Dian Sestining Ayu, ST., MT.
Format: Thesis NonPeerReviewed
Terbitan: [Yogyakarta] : Universitas Gadjah Mada , 2014
Subjects:
ETD
Online Access: https://repository.ugm.ac.id/132520/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73055
Daftar Isi:
  • Rita Supermall and Swiss-Bel Hotel one of the mega projects in Purwokerto consisting of Mall and Hotel. Rita Supermall and Swiss-Bel Hotel embodies the style inspiration in the city's first mixed development that mall and hotel. Rita Supermall will probably become itâ��s own attraction for people around Purwokerto like, Purbalingga, Wonosobo, Banjanegara, Cilacap, Kebumen and Bumiayu. Swiss-Bel Hotel will be the highest hotel in Purwokerto with 19 floors combined with Rita Supermall. At the beginning of the project, the contractor has prepared the job execution methods. In the implementation of this methods are described in detail how the implementation of the work on building projects Rita Supermall and Swiss- Bel Hotel implemented. This implementation method will be used as a reference for carrying out the work that has been planned. In building projects Rita Supermall and Swiss-Bel Hotel, use of materials, labor and equipment is appropriate, as well as casting implementation on the field is in conformity with the existing methods, and to determine the productivity of the heavy equipment in the implementation of this casting can be done by analyzing the data that has been collected in the field.