METODE PELAKSANAAN BEKISTING KOLOM, BALOK DAN PELAT LANTAI PADA GEDUNG PADEPOKAN PENCAKSILAT PROYEK SPOrT JABAR ARCAMANIK BANDUNG JAWA BARAT

Main Authors: , TRIANA NOVELIA, , Ir. Sri Winarni
Format: Thesis NonPeerReviewed
Terbitan: [Yogyakarta] : Universitas Gadjah Mada , 2013
Subjects:
ETD
Online Access: https://repository.ugm.ac.id/122520/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62624
Daftar Isi:
  • Technological developments in the world of construction in Indonesia is marked by the increasing number of innovations are used in the construction process. One example of the application of technology in the construction process is technology concrete mold (formwork). At first, the concrete casting done conventionally. Currently widely used formwork prefabricated manufactured directly by the manufacturer with a variety of brands. The objective of this internship report is that students can learn methods of mounting and dismantling formwork implementation, and systems used for column formwork system not only conventional, but also using prefabricated formwork system (Rizky), differences in the two systems in terms of both materials and tools but also methods of implementation. The discussion in this internship report is the method of implementation of formwork columns, beams and floor slabs. For column formwork system that uses two conventional systems and Rizky system. Rizky sistem formwork produced directly by the manufacturer. Rizky system for installation using heavy equipment tower crane assistance. Conclusion of the internship report is a formwork system Rizky more practical and faster than conventional formwork system, because in the installation and use its demolition shorter time and generate more columns than conventional.