PENYEIMBANGAN BEBAN PADA TRAFO SATU FASA UNTUK MENEKAN RUGI-RUGI DAYA PADA JARINGAN TEGANGAN RENDAH DI PT. PLN (PERSERO) RAYON SEDAYU
Main Authors: | , HARUM KUSUMA DEWI, , Hidayat Nur Isnianto, S.T., M.Eng. |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
[Yogyakarta] : Universitas Gadjah Mada
, 2013
|
Subjects: | |
Online Access: |
https://repository.ugm.ac.id/122466/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62568 |
Daftar Isi:
- The unbalanced load in electric power distribution system always happens and it is a common condition. The unbalanced load happens in intermediate voltage network, low voltage network, and transformer. The unbalanced load in distribution system is caused by the unbalanced of phase loads. That�s what this final project is about, that the unbalanced load happen in low voltage network. The unbalanced load causes the leakage of neutral current of transformer. Principally, the neutral current is zero when the load is balance. But in fact, the electric power distribution system is always in unbalanced load condition. So, in the 3 phase 4 wiring system that used in Central Java and D.I. Yogyakarta, the neutral current approaching zero is classified in good condition