Perancangan Koordinasi Proteksi Di Pt Pertamina Ep-Central Processing Plant Area Gundih

Main Authors: Ariyanta, Riki, , Aris Budiman, S.T., M.T.
Format: Karya Ilmiah NonPeerReviewed application/pdf
Bahasa: eng
Terbitan: , 2017
Subjects:
Online Access: http://eprints.ums.ac.id/50290/1/NASPUB%20RIKI%20X.pdf
http://eprints.ums.ac.id/50290/2/surat%20pernyataan.pdf
http://eprints.ums.ac.id/50290/
ctrlnum 50290
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.ums.ac.id/50290/</relation><title>Perancangan Koordinasi Proteksi Di Pt Pertamina&#xD; Ep-Central Processing Plant Area Gundih</title><creator>Ariyanta, Riki</creator><creator>, Aris Budiman, S.T., M.T.</creator><subject>TK Electrical engineering. Electronics Nuclear engineering</subject><description>Damages on the electrical loads and distribution equipments often occur due to disturbances. Disorders can be result from internal or external factors. One disorders that often occurs is short circuit. Isolating the fault need arotection equipment, namely overcurrent relay. In the application, to get well protection coordination, mutual current and time setting is needed between relays. Electrical Power tribution System of PT Pertamina EP-Central Processing Plant Area Gundih uses fuses those must be replaced after used. The protection devices have not ben coordinated yet. The research about designing coordination protection in PT Pertamina EP-Central Processing Plant Gundih Area is needed. This research starts with gathering data the electrical needed. Then using ETAP Power Station 12.6 application to make the single line diagram. The next step is calculating the value of short circuit current on the closest bus from relay, which already been placed. After that is do the setting overcurrent relay using all the data that has been gathered. The last step is the depiction of overcurrent relay coordination&#x2019;s curve and analysis. The results shows the magnitude of the short circuit current, the layout of the relay, stages of coordination and other parameters that are used to determine the overcurrent relay settings. The closer the location of the relay from the load, the current and time setting must be smaller than the relay setting behind itKeywords: overcurrent relay, protectioncoordination ETAP 12.6.</description><date>2017</date><type>Other:Karya Ilmiah</type><type>PeerReview:NonPeerReviewed</type><type>File:application/pdf</type><language>eng</language><identifier>http://eprints.ums.ac.id/50290/1/NASPUB%20RIKI%20X.pdf</identifier><type>File:application/pdf</type><language>eng</language><identifier>http://eprints.ums.ac.id/50290/2/surat%20pernyataan.pdf</identifier><identifier> Ariyanta, Riki and , Aris Budiman, S.T., M.T. (2017) Perancangan Koordinasi Proteksi Di Pt Pertamina Ep-Central Processing Plant Area Gundih. Tugas Akhir thesis, Universitas Muhammadiyah Surakarta. </identifier><relation>D400130038</relation><recordID>50290</recordID></dc>
language eng
format Other:Karya Ilmiah
Other
PeerReview:NonPeerReviewed
PeerReview
File:application/pdf
File
author Ariyanta, Riki
, Aris Budiman, S.T., M.T.
title Perancangan Koordinasi Proteksi Di Pt Pertamina Ep-Central Processing Plant Area Gundih
publishDate 2017
topic TK Electrical engineering. Electronics Nuclear engineering
url http://eprints.ums.ac.id/50290/1/NASPUB%20RIKI%20X.pdf
http://eprints.ums.ac.id/50290/2/surat%20pernyataan.pdf
http://eprints.ums.ac.id/50290/
contents Damages on the electrical loads and distribution equipments often occur due to disturbances. Disorders can be result from internal or external factors. One disorders that often occurs is short circuit. Isolating the fault need arotection equipment, namely overcurrent relay. In the application, to get well protection coordination, mutual current and time setting is needed between relays. Electrical Power tribution System of PT Pertamina EP-Central Processing Plant Area Gundih uses fuses those must be replaced after used. The protection devices have not ben coordinated yet. The research about designing coordination protection in PT Pertamina EP-Central Processing Plant Gundih Area is needed. This research starts with gathering data the electrical needed. Then using ETAP Power Station 12.6 application to make the single line diagram. The next step is calculating the value of short circuit current on the closest bus from relay, which already been placed. After that is do the setting overcurrent relay using all the data that has been gathered. The last step is the depiction of overcurrent relay coordination’s curve and analysis. The results shows the magnitude of the short circuit current, the layout of the relay, stages of coordination and other parameters that are used to determine the overcurrent relay settings. The closer the location of the relay from the load, the current and time setting must be smaller than the relay setting behind itKeywords: overcurrent relay, protectioncoordination ETAP 12.6.
id IOS2728.50290
institution Universitas Muhammadiyah Surakarta
institution_id 249
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Surakarta
library_id 555
collection Digital Repository Universitas Muhammadiyah Surakarta
repository_id 2728
subject_area Agama
Ekonomi
Farmasi
city KOTA SURAKARTA
province JAWA TENGAH
repoId IOS2728
first_indexed 2017-07-10T07:13:05Z
last_indexed 2017-07-10T07:13:05Z
recordtype dc
_version_ 1765811092540358656
score 17.538404