EVALUASI PENATAAN PELAKSANAAN PEKERJAAN PADA SEBUAH SITE LAYOUT PROYEK KONSTRUKSI DARI ASPEK WAKTU DAN BIAYA DENGAN BUILDING INFORMATION MODELING 4D (Studi Kasus Proyek X dan Proyek Y)
Internet
http://repository.unika.ac.id/29392/1/21.B1.0060-Evi%20Parnius%20Frenky-COVER_a.pdfhttp://repository.unika.ac.id/29392/2/21.B1.0060-Evi%20Parnius%20Frenky-BAB%20I_a.pdf
http://repository.unika.ac.id/29392/3/21.B1.0060-Evi%20Parnius%20Frenky-BAB%20II_a.pdf
http://repository.unika.ac.id/29392/4/21.B1.0060-Evi%20Parnius%20Frenky-BAB%20III_a.pdf
http://repository.unika.ac.id/29392/5/21.B1.0060-Evi%20Parnius%20Frenky-BAB%20IV_a.pdf
http://repository.unika.ac.id/29392/6/21.B1.0060-Evi%20Parnius%20Frenky-BAB%20V_a.pdf
http://repository.unika.ac.id/29392/7/21.B1.0060-Evi%20Parnius%20Frenky-DAPUS_a.pdf
http://repository.unika.ac.id/29392/8/21.B1.0060-Evi%20Parnius%20Frenky-LAMP_a.pdf
http://repository.unika.ac.id/29392/
Lokasi
Koleksi | Unika Repository |
---|---|
Gedung | Perpustakaan Universitas Katolik Soegijapranata |
Institusi | Universitas Katolik Soegijapranata |
Kota | SEMARANG |
Provinsi | JAWA TENGAH |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |